Border Patrol Horizontal Construction Services MATOC

Ended Master IDIQ Awarded

Federal agency
Awardees
13
Task orders
22
Obligated
$374,560,236

Vehicle facts

Agency
Combined task order value
  • $374,560,236 Current, with exercised options
  • $381,860,236 Potential, with all options
Last date to order 100% complete
Shared ceiling 7% used
$5,000,000,000.00

IDV award and task order details come from SAM.gov/FPDS.

About this vehicle

The U.S. Army Corps of Engineers Fort Worth District established this multiple-award horizontal construction MATOC on June 26, 2019, with a shared ceiling of $5 billion, but ordering closed on June 25, 2024; this vehicle is no longer active for new task order placement.

The vehicle contracted fixed-price design-build and design-bid-build horizontal infrastructure work including border barrier fencing, roads, drainage, levee construction, and runway/airfield improvements. The MATOC was structured with five unrestricted and five small-business-reserved awards, though actual execution diverged significantly: 21 of 22 task orders (95%) carried no set-aside designation, with only one small-business order placed. Work supported border security projects across Rio Grande Valley, Laredo, Del Rio, Big Bend, and El Paso Border Patrol Sectors, as well as USACE Southwestern and South Pacific Division initiatives. Geographic scope included Texas border sites, Arkansas navigation projects, and Fort Bliss infrastructure.

Award activity peaked at award (13 orders in 2019, all at minimum guarantee values), then declined sharply to 3 orders in 2020, 1 in 2021, and 5 in 2022, with no new awards after September 2022. Three primes dominated value: Bfbc LLC accumulated $182.2 million across 2 orders; Southwest Valley Constructors Co. held $96.1 million across 4 orders; and Randy Kinder Excavating Inc. held $94.7 million across 3 orders. These three firms captured roughly 83% of combined potential value, with 13 total contractors sharing the remainder. Customer concentration was high: the Corps of Engineers (both the Fort Worth District and broader Corps organization) obligated $381.8 million of the $381.9 million combined potential value, with one anomalous $22 thousand line to the National Geospatial Intelligence Agency. Task orders ranged from $2 thousand minimum guarantees (nine orders awarded June 2019) to the landmark $182.2 million Arkansas navigation weir project awarded July 2022. The vehicle obligated $374.6 million (98% of combined potential value), indicating nearly full deployment before order closure.

Description

Multiple Award Task Order Contract (MATOC) for fixed price horizontal construction task orders in support of the Rio Grande Valley, Laredo, Del Rio, Big Bend and El Paso Border Patrol Sectors and the US Army Corps of Engineers (USACE) Southwestern Division and South Pacific Division.

IDV awards

Show all 13

Latest task orders

Task order Awardee Awarding agency Obligated Last action
Laredo north, design/build construction of 13 miles of border barrier in… W9126G20F0759 Southwest Valley Constructors Co Army $245,176
Design-build construction of a new weir opening at the site of the… W9127S22F0082 Bfbc LLC ENDIST Little Rock (USACE) $182,183,050
RGV-07 - construction of border fence W912QR20FA002 Randy Kinder Excavating Inc. ENDIST Fort Worth (USACE) $70,196,783
All work required to complete RGV 06 for border infrastructure construction… W9126G19F0249 Southwest Valley Constructors Co ENDIST Fort Worth (USACE) $17,361,420
Replace runway 3 overrun and approach lights at fort bliss, texas. The scope is… W9126G22F0449 Gideon Contracting, LIMITED Liability Company ENDIST Fort Worth (USACE) $5,464,815
277K levee raise and slope flattening (4:1) W9126G21F0267 Southwest Valley Constructors Co ENDIST Fort Worth (USACE) $71,189,117
Design & construction of trinity portland pump station W9126G22F0083 Randy Kinder Excavating Inc. ENDIST Fort Worth (USACE) $18,689,429
Design and construction of the national intrepid center of excellence… W9126G22F0609 J & J Contractors, Inc. ENDIST Fort Worth (USACE) $3,344,558
Border infrastructure RGV roads design and construction. Period of… W9126G19F0250 Randy Kinder Excavating Inc. ENDIST Fort Worth (USACE) $5,850,330
Provide all labor and materials for the colorado river phase 1 project. Wharton… W9126G22F0176 Jsr, Inc. ENDIST Fort Worth (USACE) $13,549
RGV-07 - construction of border fence W912QR20FA001 Southwest Valley Constructors Co ENDIST Louisville (USACE) $0
Minimum guarantee $2000 W9126G19F0264 J & J Contractors, Inc. ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0263 Jsr, Inc. ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0260 Gideon Contracting, LIMITED Liability Company ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0259 Burgos Group, LLC ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0253 Slsco, LTD. ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0262 Stormwater Plans, LLC ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0252 Texas Sterling Construction CO. ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0258 Bristol Construction Services, LLC ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0251 Bfbc LLC ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0256 Gibraltar-Caddell A Joint Venture ENDIST Fort Worth (USACE) $2,000
Minimum guarantee $2000 W9126G19F0257 Puyenpa Cottles JV, LLC ENDIST Fort Worth (USACE) $2,000
Show all 22

Top awardees by obligations

Rank Awardee Obligated Share
1 Bfbc LLC $182,185,056 49%
2 Randy Kinder Excavating Inc. $94,736,542 25%
3 Southwest Valley Constructors Co $88,795,716 24%
4 Gideon Contracting, LIMITED Liability Company $5,466,815 1%
5 J & J Contractors, Inc. $3,346,558 1%
6 Jsr, Inc. $15,549 <1%
7 Slsco, LTD. Minimum guarantee only $2,000 <1%
8 Stormwater Plans, LLC Minimum guarantee only $2,000 <1%
9 Burgos Group, LLC Minimum guarantee only $2,000 <1%
10 Puyenpa Cottles JV, LLC Minimum guarantee only $2,000 <1%

"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.

Top funding agencies by obligations

Rank Funding agency Obligated Share
1 Department of the Army $374,538,236 100%
2 National Geospatial Intelligence Agency $22,000 <1%

Obligations by fiscal year

Fiscal year Obligated
FY2026 -$1,813,587
FY2025 -$38,280,248
FY2024 $16,742,773
FY2023 -$73,734,547
FY2022 -$10,999,939
FY2021 $56,230,253
FY2020 $382,347,097
FY2019 $44,068,419

Quick answers

What is the Border Patrol Horizontal Construction Services MATOC contract vehicle?

Border Patrol Horizontal Construction Services MATOC is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by National Geospatial Intelligence Agency (Department of Defense), awarded on June 26, 2019.

Which companies hold Border Patrol Horizontal Construction Services MATOC?

13 companies hold Border Patrol Horizontal Construction Services MATOC's IDV awards, one each. The latest went to Southwest Valley Constructors Co on June 26, 2019. The awardees whose task orders obligated the most are Bfbc LLC, Randy Kinder Excavating Inc. and Southwest Valley Constructors Co.

How much has been spent through Border Patrol Horizontal Construction Services MATOC?

22 task orders have been placed under Border Patrol Horizontal Construction Services MATOC, obligating $374,560,236.

What is the shared ceiling of Border Patrol Horizontal Construction Services MATOC?

Border Patrol Horizontal Construction Services MATOC's shared ceiling is $5,000,000,000; its task orders have used 7% of it.

Which agencies use Border Patrol Horizontal Construction Services MATOC the most?

The departments whose task orders under Border Patrol Horizontal Construction Services MATOC obligated the most are Department of the Army ($374,538,236) and National Geospatial Intelligence Agency ($22,000).

How much was obligated through Border Patrol Horizontal Construction Services MATOC in fiscal year 2025?

Task orders under Border Patrol Horizontal Construction Services MATOC obligated -$38,280,248 in fiscal year 2025.

On GovTribe

See this vehicle's full record

  • Every IDV award and task order
  • Funding by agency, awardee, NAICS and set-aside
  • Teaming partners on this vehicle
  • Ask GovTribe AI about this vehicle