Advanced Expeditionary Warfare Development (AEWD)
Ended Master IDIQ Awarded
- Federal agency
-
ACC Aberdeen Proving Ground
+ 1 more agency
- Awardees
- 16
- Task orders
- 76
- Obligated
- $468,693,656
Vehicle facts
- Opportunity
-
- Advanced Expeditionary Warfare Development Solicitation · W911NF15R0004 · Posted Jun 24, 2015
- Agencies
-
- ACC Aberdeen Proving Ground Army Contracting Command, Department of Defense
- Research Development and Engineering Command Army Materiel Command, Department of Defense
- Combined task order value
-
- $554,808,499 Current, with exercised options
- $580,400,148 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 59% used
- $800,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Department of the Army Materiel Command Research Development and Engineering Command awarded the Advanced Expeditionary Warfare Development (AEWD) Master IDIQ on September 18, 2015, with a shared ceiling of $800 million; ordering closed on September 17, 2020, and the vehicle is no longer accepting new task orders.
Seventy-six task orders have been awarded under AEWD, with combined potential value of $580.4 million, of which $468.7 million (81%) has been obligated. The most recent task order was awarded in March 2022. Activity peaked in 2018 with 14 orders; subsequent annual ordering declined to between 1 and 6 orders per year through 2022. The vehicle supported development, demonstration, assessment, field experimentation, and operational evaluation across five mission areas: Technology Transition for Advanced Research and Development, Countering Adaptable Threats, Irregular Warfare Support, Expeditionary Forces and Special Operations, and Deployable Force Protection. Technical scope includes electronic and sensor systems, software design and integration, mechanical design and development, materials development and employment, system integration, and human systems interface.
Leidos, Inc. dominates the vehicle, holding 23 orders valued at $330.1 million in combined potential value—approximately 57% of total combined potential. Envistacom, L.L.C. ranks second with 8 orders ($85.3 million), followed by Battelle Memorial Institute and The Charles Stark Draper Laboratory, Inc., each with 8 and 7 orders respectively. Five primes collectively account for 67% of task orders and 88% of combined potential value. The remaining 13 contractors hold smaller individual portfolios.
The Army Materiel Command Research Development and Engineering Command placed 43 orders ($261.7 million in combined potential value), representing approximately 72% of activity by order count. Navy customers—Naval Sea Systems Command, Naval Air Systems Command, and the broader Navy enterprise—placed a secondary tier of orders. The Marine Corps and other service branches represent residual ordering volume.
Ninety-five percent of task orders carried no set-aside designation, with two service-disabled veteran-owned small business awards representing the only small-business activity. Pricing was predominantly Cost Plus Fixed Fee across the portfolio. Task order ceilings ranged widely, from minimal pilot orders of $2,500 to a large 2022 Air Force RDT&E delivery order valued at $76.2 million. Representative mid-sized orders in 2021 ranged from approximately $1 million to $17.5 million.
Description
The AEWD Master IDIQ provides services to support a diverse group of organizations that span the spectrum of mission areas for expeditionary warfare related requirements. Areas of support include Mission Area Support such as Technology Transition for Advanced Research and Development; Countering Adaptable Threats; Iirregular Warfare Support; Expeditionary Forces and Special Operations; and Deployable Force Protection. Technical Area Supported include development, reproduce and field items and systems for use in demonstrations, assessments (CONUS or in-Theatre), field experiments, and operational evaluations for the mission areas identified above. Other Technical Areas include Electronic and Sensor Systems, Software Design, Development and Integration, Mechanical Design and Development of Components and Systems and Materials Development, Integration and Employment, System Integration and Human Systems Interface (HSI).
IDV awards
Show all 16
Latest task orders
Show 15 more
Latest 25 of 76 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Leidos, Inc. | $279,259,241 | 60% |
| 2 | Envistacom, L.l.c | $78,802,767 | 17% |
| 3 | Peraton Inc. | $21,372,041 | 5% |
| 4 | The Charles Stark Draper Laboratory, Inc. | $20,393,084 | 4% |
| 5 | Booz Allen Hamilton Inc. | $17,560,796 | 4% |
| 6 | Battelle Memorial Institute | $15,247,835 | 3% |
| 7 | Peraton Inc. | $13,857,841 | 3% |
| 8 | Wintec Arrowmaker, Inc. | $11,930,662 | 3% |
| 9 | Ideal Innovations Incorporated | $4,003,494 | 1% |
| 10 | Janus Research Group, LLC | $1,950,571 | <1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $247,723,124 | 53% |
| 2 | Air Force | $202,267,062 | 43% |
| 3 | Department of the Navy | $15,410,010 | 3% |
| 4 | Defense Finance and Accounting Service | $1,620,800 | <1% |
| 5 | Defense Contract Management Agency | $1,245,692 | <1% |
| 6 | Washington Headquarters Service | $426,969 | <1% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2025 | $800,764 |
| FY2024 | $3,310,509 |
| FY2023 | $38,127,367 |
| FY2022 | $31,745,344 |
| FY2021 | $49,094,964 |
| FY2020 | $56,956,141 |
| FY2019 | $90,085,682 |
| FY2018 | $101,946,736 |
| FY2017 | $61,779,120 |
| FY2016 | $34,847,036 |
Quick answers
What is the AEWD contract vehicle?
Advanced Expeditionary Warfare Development (AEWD) is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by ACC Aberdeen Proving Ground (Army Contracting Command) and Research Development and Engineering Command (Army Materiel Command), awarded on September 18, 2015.
Which companies hold AEWD?
16 companies hold AEWD's IDV awards, one each. The latest went to K2 Solutions Inc. on September 18, 2015. The awardees whose task orders obligated the most are Leidos, Inc., Envistacom, L.l.c and Peraton Inc.
How much has been spent through AEWD?
76 task orders have been placed under AEWD, obligating $468,693,656. Their combined current value, with exercised options, is $554,808,499.
What is the shared ceiling of AEWD?
AEWD's shared ceiling is $800,000,000; its task orders have used 59% of it.
Which agencies use AEWD the most?
The departments whose task orders under AEWD obligated the most are Department of the Army ($247,723,124), Air Force ($202,267,062) and Department of the Navy ($15,410,010).
How much was obligated through AEWD in fiscal year 2025?
Task orders under AEWD obligated $800,764 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle