Access Control Point Design Build II
Ended Master IDIQ Awarded
- Federal agency
-
Engineering Support Center Huntsville
- Awardees
- 22
- Task orders
- 34
- Obligated
- $24,904,460
Vehicle facts
- Opportunity
-
- Access control point program design build II -- RFI(2) Pre-Solicitation · W912DY21R0030 · Posted Apr 8, 2020
- Agency
-
- Engineering Support Center Huntsville US Army Corps of Engineers, Department of Defense
- Combined task order value
-
- $24,904,460 Current, with exercised options
- $25,012,444 Potential, with all options
- Last date to order 100% complete
- Shared ceiling 26% used
- $95,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The Army Corps of Engineers Engineering Support Center Huntsville established a Master IDIQ for design-build construction services supporting the Access Control Point program, with ordering authority expiring August 25, 2026—approximately one month remaining. Originally awarded as competitive 8(a), the vehicle now shows a $25 million combined task-order potential value with $24.9 million obligated (100% of potential value), indicating the vehicle is substantially consumed.
Activity has declined sharply since the initial award phase. The vehicle generated 22 task orders in 2021, then dropped to single digits annually: four orders in 2022, three in 2023, four in 2024, and one in 2025. The most recent order awarded September 30, 2025. Of the 34 total task orders, 18 consist of $2,000 minimum-guarantee orders distributed across multiple primes in 2021—largely placeholder positions—leaving 16 substantive orders that comprise the working portfolio.
Services include survey, evaluation, design, and construction of access control points throughout the contiguous United States, Alaska, Hawaii, and outlying areas. Recent task orders detail installations at military installations: Fort Gregg-Adams, Fort Detrick, Fort Campbell, and JBLM, with scopes ranging from gate installations and automated vehicle barrier systems to electrical upgrades and site investigations. Pricing is firm fixed price across all awards.
Nisou PSP Security JV LLC and GRK Bhate JV, LLC dominate the vehicle, holding 11 of 34 orders and $17.3 million of the $25 million potential value combined—roughly 69% of activity. Doyon Management Services, SES Civil And Environmental LLC, Chenega Security International, and a long tail of 17 smaller primes round out the 22 awardees. Actual ordering is concentrated in the Department of the Army Corps of Engineers Engineering Support Center Huntsville (32 orders, $20.1 million), with two orders ($4.9 million) placed through a subordinate Army Corps entity. The set-aside mix shifted from the original competitive 8(a) structure: 28 orders (82%) carry no set-aside, while only six orders (18%) retain the 8(a) designation.
With no ordering authority remaining past late August and potential value already fully obligated, new work cannot be pursued under this vehicle. The window for task-order competition has effectively closed.
Description
Design build construction in support of the ACP program for the provision of repair and renewal services. Services will include: survey problem areas; evaluate and recommend solutions; develop and implement work plans; and provide the efforts to support the design solution throughout the United States.
IDV awards
Show all 22
Latest task orders
Show 15 more
Latest 25 of 34 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Nisou PSP Security JV LLC | $9,053,211 | 36% |
| 2 | GRK Bhate JV, LLC | $8,231,871 | 33% |
| 3 | SES Civil And Environmental LLC | $2,926,141 | 12% |
| 4 | Doyon Management Services, LLC | $2,736,667 | 11% |
| 5 | Chenega Security International, LLC | $1,922,572 | 8% |
| 6 | Dawson Enterprises, Inc. | $2,000 | <1% |
| 7 | National Native American Construction, Inc. | $2,000 | <1% |
| 8 | Tikigaq Federal Services LLC | $2,000 | <1% |
| 9 | Firelake Construction Inc. | $2,000 | <1% |
| 10 | Davies, Linda M | $2,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Army | $24,904,460 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $587,889 |
| FY2025 | $2,005,830 |
| FY2024 | $8,396,658 |
| FY2023 | $11,550,714 |
| FY2022 | $2,327,369 |
| FY2021 | $36,000 |
Quick answers
What is the Access Control Point Design Build II contract vehicle?
Access Control Point Design Build II is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Engineering Support Center Huntsville (US Army Corps of Engineers), awarded on August 26, 2021.
Which companies hold Access Control Point Design Build II?
22 companies hold Access Control Point Design Build II's IDV awards, one each. The latest went to LRG Construction JV LLC on November 29, 2021. The awardees whose task orders obligated the most are Nisou PSP Security JV LLC, GRK Bhate JV, LLC and SES Civil And Environmental LLC.
How much has been spent through Access Control Point Design Build II?
34 task orders have been placed under Access Control Point Design Build II, obligating $24,904,460.
What is the shared ceiling of Access Control Point Design Build II?
Access Control Point Design Build II's shared ceiling is $95,000,000; its task orders have used 26% of it.
Which agencies use Access Control Point Design Build II the most?
The departments whose task orders under Access Control Point Design Build II obligated the most are Department of the Army ($24,904,460).
How much was obligated through Access Control Point Design Build II in fiscal year 2025?
Task orders under Access Control Point Design Build II obligated $2,005,830 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle