The project will fund four activities 1 upgrades to electrified ship to shore cranes acquisition of new equipment and installation of solar panels on terminal buildings that will improve the…
Active Project Grant Awarded Last action
- Award ID
- 693JF72344027
- Recipient
-
State Of Hawaii Department Of Trans UEI LW6MX3XYY523
- Awarding agency
-
Maritime Administration
Department of Transportation
- Obligated
- $81,144,870
Award facts
- Assistance listing
- 20.823 Port Infrastructure Development Program
- Completion date 28% complete
- Originally
- Funding
-
- $40,040,279.00 Federal
- $41,104,591.00 Non-federal
- Place of performance
- Honolulu, HI 96813, USA
Award details come from USAspending.gov.
Description
The project will fund four activities 1 upgrades to electrified ship to shore cranes acquisition of new equipment and installation of solar panels on terminal buildings that will improve the reliability of port operations 2 smart gate and security technology to improve safety and operational efficiency 3 an electrical micro grid to improve resilience and 4 in collaboration with local communities and stakeholders development of a facility resiliency plan and a terminal electrification plan to support additional environmental and resilience improvements in the future. Activities to be performed component 1 operations equipment and improvements this component includes operations and infrastructure improvements including vital upgrades to electrified ship to shore cranes new equipment and other upgrades technologies including the following 12 top handlers 7 diesel 5 electric. 28 utility tractor RIG UTR yard tractors. 1 15 ton forklift. 1 5 ton forklift. 8 pick up trucks. 1 tour van. 9 personnel vehicles. 7 150 KW electric vehicle supply equipment evse. 24 less than 20 KW evse. Transportation of 5 ship to shore STS cranes from california to hawaii via barge. Two round trip transports of STS crane self propelled modular transporters spmts between california and hawaii. STS crane move and barge HSI labor. 5 STS crane condition monitoring systems. 1 STS crane battery energy storage system and installation. 5 STS crane regeneration drives and installation. Component 2 terminal operating technology and security systems. This component includes the projects operating systems autogate and terminal tracking systems and the necessary security systems and IT infrastructure improvements as described below. Terminal operating technology TOT. 1 outdoor wireless equipment. 1 vehicle mounted technology. Terminal operating system TOS including integration installation and support. TOT autogate and terminal tracking. 5 STS optical character recognition OCR systems. 2 weigh in motion scales. 1 gate OCR. 1 paperless pedestal. 1 radio frequency identification rfid tags inspection system. Security systems. 1 closed circuit television CCTV system. 1 security systems. Switch router. Electrified door hardware. Inside wiring for access control. Cyber enhancements. Information technology IT project management local tech support. Uninterruptible power supplys UPS. Cybersecurity annex plan. Cybersecurity systems and core networking. Backup serves. Core networking firewalls. 1 watchtower control system. Command module. Indoor WI-FI with cybersecurity. Gate equipment system. 1 transportation worker identification card twic reader. Security master key program. Radiation portal monitor RPM inspection system. IT infrastructure administration. Purchase of new building FFE furniture fixtures and equipment and workstation. Conference room setup. Wallboards. Buildout of server rooms. Building cabling BCS. Component 3 deployment of an electrical microgrid. This component includes the deployment of a resilient long duration energy storage and microgrid powered by micro wind and solar energy generation systems for resilient operations throughout the terminal. Electrical microgrid includes the design procurement installation deployment and commissioning of the following. Microgrid battery system. Backup power systems generators and or batteries. 5 100KW windwall for the STS cranes. 100KW windwall installation labor solar power for at least 3 terminal buildings employee parking. Component 4 planning project administration workforce development and training and outreach. This component includes the following five tasks. Task 1 project management administration and planning. Ongoing project management administration and planning until project closeout . Task 2 workforce development and training. Conduct evse microgrid renewable power system and electrification maintenance training in coordination with relevant training vendors. Task 3 equity community and stakeholder outreach. Prepare and execute an equity and stakeholder outreach plan detailing outreach targets collateral and timeline. Summarize data from outreach in an equity and stakeholder outreach report. Development of the equity inclusion plan. Task 4 planning measurement and verification M and V. Prepare a planning and permitting plan and develop a summary of steps taken for all relevant project components in a planning and permitting report. Prepare a cyber annex plan. Prepare an inter-island barge transloading plan. Facility resilience plan and terminal electrification plan. The plans will be developed through substantial community and stakeholder engagement with particular focus on resilient, advanced energy technologies and zero emission deployments including wind micro solar stations battery storage shore power and zero emission cargo handling equipment CHE. Task 5 technology and knowledge transfer prepare a technology and knowledge transfer plan to include provisions dealing with any intellectual property developed in the project project website case studies targeting policymakers fleets and technology vendors project videos conference presentations and project webinars. Prepare a technology and knowledge transfer report. Deliverables and expected outcomes performance measure table from attachment G page 17 of the grant agreement measure category and description measurement frequency. Truck miles reduced miles emissions benefits total truck miles reduced calculated into reduced GHG emissions carbon monoxide and particulate matter for mode of transportation as defined in the project study area. Quarterly. Cargo volume total tons of cargo moved per year teus. Economic competitiveness measures the movement of freight in teus through the project study area. Quarterly. Greenhouse gas emissions varies emissions benefits the total calculated GHG emissions, carbon monoxide and particulate matter for the applicable modal model for elements defined in the project study area. Measured daily monthly or annually. Annually. Intended beneficiary state of hawaii department of trans. Subrecipient activities none.
Transactions
| Action | Federal | Non-federal | Date |
|---|---|---|---|
| Amendment | $0 | $0 | |
| Original award | $40,040,279 | $41,104,591 |
Subawards
| Subrecipient | Amount | Awarded |
|---|---|---|
| Hawaii Stevedores, Inc. | $40,040,279 |
Quick answers
Who received award 693JF72344027?
693JF72344027 was awarded to State Of Hawaii Department Of Trans by Maritime Administration (Department of Transportation) on February 15, 2024.
How much is award 693JF72344027 worth?
$81,144,870 has been obligated on 693JF72344027: $40,040,279 in federal funding and $41,104,591 in non-federal funding.
On GovTribe
See this award's full record
- Every transaction and subaward
- The recipient's other awards and teaming partners
- Similar grant awards
- Ask GovTribe AI about this award