Delivery Order N6247822D4006-N6247823F4079
- The Navy Installations Command awarded a $197.97 billion delivery order to Hawaii Harbors Constructors JV on July 30, 2025, for the repair of Wharves B20 and B21 at Joint Base Pearl Harbor-Hickam in Hawaii, with an ultimate completion date of October 26, 2028. This firm fixed price delivery order was issued under the Design-Build and Design-Bid-Build Waterfront Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract established through June 2027, which carries a $995 million...
- The Naval Facilities Engineering Command (NAVFAC) awarded a $1.835 million firm fixed-price delivery order to Warfeather-GM JV LLC on June 18, 2025, for emergency water infrastructure repairs at Ford Island, Pearl Harbor, Hawaii. The contract addresses the repair of a failed 24-inch water main and associated waterline break, with an ultimate completion date of August 29, 2025. This delivery order was issued under the Design-Build and Design-Bid-Build SDVOSB MACC (Multiple Award Contracts for...
- This is a $17,666,499.00 firm fixed price contract awarded by the Naval Facilities Engineering Command (NAVFAC) to Healy Tibbitts Builders, Inc., a subsidiary of Weeks Marine Inc., to replace a 24-inch underwater waterline crossing between Ford Island and Landing C at Joint Base Pearl Harbor-Hickam, Hawaii. The contract has an ultimate completion date of April 22, 2019 and does not utilize any small business set-aside designations. Healy Tibbitts Builders has received prior prime contract awards...
- The Department of the Navy Installations Command awarded a $1.2 million firm fixed price delivery order to Fukunaga & Associates, Inc. to replace a 24-inch waterline at Joint Base Pearl Harbor-Hickam in Hawaii. The work will be performed over a six year period from June 2020 through May 2026 at the base located in Pearl Harbor. No subcontractors or set aside designations were identified. The delivery order was issued under an existing multiple award contract vehicle to support the Navy's...
- <p>This is a delivery order contract awarded by the Naval Facilities Engineering Command (NAVFAC), a defense agency, to Starlight-Shintani-Greenwave JV, a veteran-owned small business, to replace a 6-inch waterline at Dry Dock 2 in Joint Base Pearl Harbor-Hickam, Hawaii. The contract has a firm fixed price of $1,314,936.16 and a period of performance ending on August 17, 2017. There is no set-aside designation for this award.</p>
- The Department of the Navy Installations Command awarded a $555,617 firm fixed price delivery order contract to Fukunaga & Associates, Inc. to provide Architectural Engineering Services for the design, bid, build design and specifications for Project RM22-0005, which involves repairing a 24-inch underwater waterline crossing between Ford Island and Landing C at Joint Base Pearl Harbor-Hickam in Honolulu, Hawaii. The work will be performed over a five-year period from March 9, 2022 through...
- This is a delivery order award to Kiewit Infrastructure West Co., a subsidiary of Peter Kiewit Sons Inc., for a waterline break repair project at Joint Base Pearl Harbor-Hickam in Hawaii. The award is a firm fixed-price contract with a ceiling value of $1,728,700.00 and an ultimate completion date of January 4, 2024. The work is being performed under the Design-Build and Design-Bid-Build Waterfront Multiple Award Construction Contract (MACC) for various locations in Hawaii and Wake Island,...
- This is a federal contract award from the Naval Facilities Engineering Command (NAVFAC) to Hako Plumbing, Inc., a small, minority-owned business certified as a Historically Underutilized Business Zone (HUBZone) firm by the Small Business Administration. The $5,955,950.00 firm fixed-price Delivery Order is for the replacement of a 12-inch waterline at Joint Base Pearl Harbor-Hickam in Hawaii. The award is part of NAVFAC's Design-Build and Design-Bid-Build HUBZone Multiple Award Construction...
- This is a firm fixed-price delivery order awarded by the Navy Installations Command to Insight Pacific, LLC, a minority-owned limited liability company, to replace a waterline and salt waterline tunnel at Joint Base Pearl Harbor-Hickam in Hawaii. The $12,050,000 order was issued under a larger $499 million multiple award construction contract the Navy has with Insight Pacific and other firms for design-build and design-bid-build services across Hawaii from 2021 to 2026. This specific project...
- This firm fixed-price delivery order for $2,262,338.00 was awarded by the Naval Facilities Engineering Command (NAVFAC) to Allied Pacific Builders Inc., a minority-owned small disadvantaged construction business, to replace a 12-inch waterline at Joint Base Pearl Harbor-Hickam in Hawaii. The award was made under NAVFAC's Hawaii Construction Multiple Award Construction Contract (MACC) 2016-2021, a $245 million indefinite-delivery/indefinite-quantity contract vehicle that provides new...
- N6247822D4006Indefinite Delivery Contract
- N6247822D4006-N6247823F4079Delivery Order
This federal contract award N6247822D4006|N6247823F4079 is a $16,718,397.00 firm fixed price delivery order issued by the U.S. Navy Installations Command (NAVFAC) to Hawaii Harbors Constructors JV, a for-profit construction services company. The contract is for the repair of a 24-inch underwater waterline crossing between Ford Island and Landing C at Joint Base Pearl Harbor-Hickam in Hawaii. The work is to be completed by June 19, 2024. This delivery order was issued under a larger $995 million maximum value, multiple award, indefinite delivery/indefinite quantity (IDIQ) contract vehicle for design-build and design-bid-build waterfront construction projects across Hawaii and Wake Island, which Hawaii Harbors Constructors JV was previously awarded. The contract does not have any set-aside designations.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
RM 22-1212 DRY DOCK 4 FLOOR AND ELECTRICAL UPGRADES, SIOP, PHNSY, JBPHH | N6247825RPC06 | Department of the Navy Naval Facilities Engineering Command | Limited / Sole Source Justification 1/1 | 6/30/25, 9:17 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| P00001 | Supplemental Agreement for work within scope | ($257k) | 2/11/25 | |
| Not listed | Not listed | $17.0m | 3/27/23 |