Recapitalization of power generation plant and supervisory control and data acquisition (SCADA), located on buckley AFB, CO

Active Definitive Contract Awarded Last action

Contract number
W912DR21C0023
Awardee
Awarding agency
Obligated
$209,947,660

Award facts

Opportunity
Contract value 100% obligated
  • $209,947,660.02 Current, with exercised options
  • $210,427,660.02 Potential, with all options
Completion date 95% complete
Current and potential, with all options
Set-aside
No set-aside
Competition
Full and Open Competition · 2 offers Negotiated Proposal / Quote
Pricing
Firm Fixed Price
Place of performance
Aurora, CO 80010, USA
Legislative mandates

Award details come from SAM.gov/FPDS.

Transactions

Action Obligated Date
Supplemental Agreement for work within scope A00116 $134,447
Supplemental Agreement for work within scope A00115 · In-scope modification to W912DR21C0023/ADF recap 3 elec plan construction/ADF recap 3/contract #W912DR21C0023 $56,743
Supplemental Agreement for work within scope A00114 · Supply fans SF-16/17 free spin due to CPH positive pressure, leaking building air. Installing backdraft dampers (up to 5 inches WG) with blade stops will stop… $14,290
Supplemental Agreement for work within scope A00113 · Install two hmis at LC-l/q. Replace LC-g/h doors, install three SEL 751 relays (using GFE module), and replace the 24VDC UPS. $187,703
Supplemental Agreement for work within scope A00112 · The existing load center j (LC-j) control panel is obsolete and requires manual, on-site breaker operation. To resolve this, the government concurred with… $77,975
Supplemental Agreement for work within scope A00111 · Per OSHA 29 CFR 1910.212(a)(1), install guards on the eight (8) supply fans on the CPH mezzanine. The guards shall be custom-fabricated by the fans… $83,895
Supplemental Agreement for work within scope A00110 $35,094
Supplemental Agreement for work within scope A00109 $0
Supplemental Agreement for work within scope A00108 $128,953
Supplemental Agreement for work within scope A00107 · The AHJ has determined that the contractor shall install the shunt trip device on the AC breakers feeding the battery chargers per UFC 3-520-05 section 2-6.1… $56,468
Supplemental Agreement for work within scope A00106 $115,924
Change Order P00020 · R00127-1 day tank venting $333,550
Supplemental Agreement for work within scope A00105 · To mitigate risk to the users facility/equipment, integrate load center LC-B494-15B prior to LC-B494-15A. This requires modification of the SEL network sequence… $35,502
Additional Work (new agreement, FAR part 6 applies) P00019 $894,036
Supplemental Agreement for work within scope A00104 · Install a 1/4-inch pressure-reducing valve to regulate inlet pressure to the dosing cabinet solenoid valve at 3-5 PSI. Set back-pressure regulator fully open,… $24,038
Supplemental Agreement for work within scope A00103 · Building 494 valves require 120V power and is not shown within IFC. This change adds the 120 VAC power to the valves within building 494 to have a working… $261,357
Supplemental Agreement for work within scope A00102 · Addition of redundant feed utilizing change of power source and pulling the cables to this new feed. This is necessary as the HMI for load center j requires two… $35,997
Supplemental Agreement for work within scope A00101 · Site standards require redundant power FED to plcs at TFP-B494-01A/02A, but there is none in the IFC drawings. Redundant tech power sources for plcs at… $85,370
Supplemental Agreement for work within scope A00100 · CD-ADF-c, recap #3, buckley SFB, CO R00109 load bank tie-in breaker at ppmv $38,704
Supplemental Agreement for work within scope A00098 · CD - ADF-c recap #3, buckley space force base R001112 69 milcon racks & PDC walkways grounding $67,281
Supplemental Agreement for work within scope A00099 · CD - ADF-c recap #3, buckley space force base R00108 MVS-ppmv-15A & b DC power $35,349
Supplemental Agreement for work within scope A00097 · CD-ADF-c recap #3, buckley SFB, CO R00098 revisions to 69 milcon transformers e and w $92,130
Supplemental Agreement for work within scope A00096 · CD - ADF-c recap #3, buckley SFB, CO R00110 conductors to FOP-ppmv-09&-10 $99,876
Other Administrative Action A00095 · CD - ADF-c recap #3 buckley SFB, CO R00103-1 correction to R00103/A000094 extend GOV OC trailers modification $0
Supplemental Agreement for work within scope A00094 · CD - ADF-c recap #3, buckley SFB, CO R00103 extend GOV OC trailers $227,450
Supplemental Agreement for work within scope A00093 · CD - ADF-c recap #3, buckley SFB, CO R00101 LC-12-1 and 12-2 on GEN signal to UPS $71,576
Supplemental Agreement for work within scope A00092 · CD-ADF-c recap #3, buckley SFB, CO R00106 PDC-a retaining wall $50,990
Supplemental Agreement for work within scope A00091 · CD - ADF-c recap #3, buckley SFB, CO R00105 power to security panels $48,315
Change Order P00017 · ADF-c recap 3, buckley AFB. CO $388,121
Supplemental Agreement for work within scope A00090 · CD-ADF-c recap #3, buckley SFB, CO R00100 tech power feeders into pdcs $220,460
Supplemental Agreement for work within scope A00089 · CD-ADF-c recap #3, buckley SFB, CO R00094 guardhouse credit -$46,039
Supplemental Agreement for work within scope A00088 · CD-ADF-c recap #3, buckley SFB, CO R00096 klaxon sounder $14,779
Supplemental Agreement for work within scope A00087 · CD - ADF-c recap #3 buckley SFB, CO R00095 internal plcs on LCS l, q, s, g, h, b, e $113,508
Supplemental Agreement for work within scope A00086 · CD - ADF-c recap #3, buckley SFB, CO R00097 mop 25-0008-TPP-MCC1T escorts $10,040
Additional Work (new agreement, FAR part 6 applies) P00016 · Update contract drawings. $175,000
Other Administrative Action P00015 · Implementation of executive orders 14148 and 14173 $0
Supplemental Agreement for work within scope A00085 · CD-recap #3 ADF-c, buckley SFB, CO R00091 ppmv fics PLC location and power $60,177
Supplemental Agreement for work within scope A00084 · CD-recap #3, ADF-c, buckley SFB, CO R00093 g & h panelmate & control $20,382
Supplemental Agreement for work within scope A00083 · CD-recap #3-ADF-c, buckley SFB, CO R00089 urea-02 panel $55,562
Supplemental Agreement for work within scope A00082 · CD-ADF-c recap #3, buckley SFB, CO R00090 generator control system network $21,308
Supplemental Agreement for work within scope A00081 · CD-ADF-c recap #3, buckley SFB, CO R00080 CPH & ATO conduit and terminations -$202,848
Supplemental Agreement for work within scope A00080 · CD-ADF-c recap #3, buckley SFB, CO R00086 CPH valve power $379,180
Supplemental Agreement for work within scope A00079 · CD-ADF-c recap #3, buckley SFB, CO R00084 MCC ARC resistance requirement -$280,930
Supplemental Agreement for work within scope A00078 · CD-ADF-c recap #3, buckley SFB, CO R00088 PDC security $54,027
Supplemental Agreement for work within scope A00077 · CD-recap 3 ADF-c, buckley SFB, CO R00085 mccats fics network integration $38,464
Supplemental Agreement for work within scope A00076 · CD - recap 3, ADF-c, buckley SFB, CO R00079 DC power updates 85-milcon $11,535
Supplemental Agreement for work within scope A00073 · CD-recap 3 ADF-c, buckley SFB, CO R00044 vecp TVP transformers -$224,699
Supplemental Agreement for work within scope A00074 · CD - recap 3 ADF-c, buckley SFB, CO R00061 feeder redesign to building 460 $417,938
Supplemental Agreement for work within scope A00075 · CD - recap 3 ADF-c, buckley SFB, CO R00083 fics essential gear for LC EE, FF, GG, ad, and k $76,053
Supplemental Agreement for work within scope A00072 · CD - recap 3 ADF-c buckley SFB, CO R00082 area 8 unforeseen conditions $70,897
Show 40 more

Latest 50 listed here. See the rest on GovTribe.

About this award

ENDIST Baltimore, on behalf of the U.S. Army Corps of Engineers, awarded a $210.4 million definitive contract to M.c. Dean, Inc. for recapitalization of the power generation plant and supervisory control and data acquisition (SCADA) system at Buckley Air Force Base, Colorado on September 30, 2021, under firm fixed pricing with no set-aside designation.

The originating pre-solicitation (posted February 26, 2020) sought contractors capable of designing and installing a comprehensive replacement of the existing medium voltage power generation and distribution system serving mission-critical facilities. Required capabilities included underground duct bank construction, medium voltage electrical systems, utility buildings, and SCADA infrastructure at similar scope and value. The estimated contract value ranged from $250 million to $500 million over a four-year period.

Place of performance is Aurora, Colorado. The contract's ultimate completion date is January 27, 2027. M.c. Dean is a large business federal contractor headquartered in McLean, Virginia, with substantial federal infrastructure and power systems experience anchored in Navy C4ISR and electronic security installations, GSA facilities maintenance, and defense facility modernization work. The company operates on full-and-open competition without set-aside reliance and historically performs the majority of delivery in-house with selective subcontracting.

The subcontractor team includes Diverzify + LLC (cleaning services), Palmer Drives Controls and Systems, Inc. (switchgear installation), and a multi-vendor team for electrical materials, wire and cable, fuel systems, battery components, SCADA controls, and power distribution equipment including Border States Industries, Elliott Electric Supply, Capital Lighting & Supply LLC, Rexel USA, Rosemount Inc., Southland Industries, Amentum Services Inc., HPM Inc., and specialized service providers for testing, commissioning, and electrical contracting work.

Subawards

Subcontractor Amount Awarded
Diverzify + LLC RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Provide cleaning services for new… $69,275
Palmer Drives Controls And Systems, Inc. RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Switchgear door installation. $149,875
KCM Marketing, Inc. Recapitalization of power generation plant and supervisory control and data acquisition (SCADA), located on buckley AFB, CO battery. $61,585
Capital Lighting & Supply LLC RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Electrical material $86,592
Elliott Electric Supply, Inc. RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Cable (Copper) $36,389
Northwest Arkansas Continuum Of Care RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Fuel. $49,689
Eaton Sales & Service LLC Recapitalization of power generation plant and supervisory control and data acquisition (SCADA), located on buckley AFB, CO clean fuel tank $58,144
Border States Industries Inc. RECAPITALIZATION OF POWER GENERATION PLANT AND SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA), LOCATED ON BUCKLEY AFB, CO Wire and Cable $32,104
Rexel Usa, Inc. CD-ADF-c recap #3, buckley SFB, CO R00090 generator control system network power distribution/switchgear $100,250
Rexel Usa, Inc. CD-ADF-c recap #3, buckley SFB, CO R00090 generator control system network power distribution/switchgear $56,083
Southland Industries CD-ADF-c recap #3, buckley SFB, CO R00086 CPH valve power recapitalize the exisiting medium voltage power generation and distribution for mission critical group $95,809
RK Electrical LLC CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00086 CPH VALVE POWER Electrical Services $309,615
DMG Inc. CD-ADF-c recap #3, buckley SFB, CO R00086 CPH valve power start up and commissioning of automatic transfer switches $36,633
Amentum Services, Inc. CD - RECAP 3, ADF-C, BUCKLEY SFB, CO R00079 DC POWER UPDATES 85-MILCON Shipment of (4) PDC modules for Recap 3 project. $459,652
Hpm, Inc. CD - RECAP 3, ADF-C, BUCKLEY SFB, CO R00079 DC POWER UPDATES 85-MILCON MC Dean will be providing services for construction of an all inclusive solution to… $216,744
Stanley Consultants Inc. CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00082 AREA 8 UNFORESEEN CONDITIONS ENGINEERING TO DEV SEL relay settings $137,717
Communications Supply Corporation CD - RECAP 3 ADF-C BUCKLEY SFB, CO R00087 FUNDING CORRECTION Singlemode fiber cable adn Innerduct $38,625
Nova Building Solutions LLC CD - recap 3 ADF-c buckley SFB, CO R00082 area 8 unforeseen conditions swgr, UPS power distribution $11,061,120
Electric Power Systems International, Inc. CD - recap 3 ADF-c buckley SFB, CO R00087 funding correction neta testing $299,963
Wagner Equipment Co Recapitalization of power generation plant and supervisory control and data acquisition (SCADA), located on buckley AFB, CO swgr/power distribution $11,641,582
Border States Industries Inc. CD-recap 3 ADF-c, buckley SFB, CO R00047 DC power for load ctrs from bldg a&b equipment $54,186
Rosemount Inc. CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00069 GEN. EXHAUST STACK RAIN MITIGATION Sensors and Transducers $177,380
Hpm, Inc. CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00076 RGS GRC WITH EMT AT CPH AT OR BELOW 600V POWER MOD 13 Construction MGt $225,233
Rosemount Inc. CD - recap 3, buckley SFB, CO R00070 - fics - device labeling hot standby alarm light buzzer sensors and transducers $341,554
Guarantee Electrical Contracting Llc. CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00076 RGS GRC WITH EMT AT CPH AT OR BELOW 600V POWER General electrical work to include temporary lighting, Lighting,… $22,113,072
Capital Lighting & Supply LLC CD - ADF-c recap 3, buckley SFB, CO R00076 RGS GRC with EMT at CPH at or below 600V power device integration PME upgrade $31,269
Industrial Connections & Solutions LLC CD - ADF-c recap 3, buckley SFB, CO R00076 RGS GRC with EMT at CPH at or below 600V power switchgear equipment $513,425
Bay City Equipment Industries Inc. CD-ADF-C RECAP #3, BUCKLEY SFB, CO R00048 DELETE MEZZANINE DOOR 147A Construction Management $119,341
Architect One, Inc. CD-ADF-c recap #3, buckley SFB, CO R00048 delete mezzanine door 147A structural/architectural design $15,000
Intermountain Testing Company, LLC CD-ADF-c recap #3, buckley SFB, CO R00048 delete mezzanine door 147A steel testing, inspections, and reporting $33,500
D.l. George & Sons Manufacturing, Inc. CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00049 SEL FEEDER PROTECTION RELAY LOGGING REVISIONS M.C. Dean, Inc. (MCD) is currently a prime contractor to USG 2, US Army… $812,682
Nova Building Solutions LLC CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00064 FUEL LINE D Power Plant Fire Alarm Detection $662,923
Guarantee Electrical Contracting Llc. CD - ADF-C RECAP 3, BUCKLEY SFB, CO R00064 FUEL LINE D Electrical $18,257,325
Show all 33

Quick answers

Who was awarded contract W912DR21C0023?

W912DR21C0023 was awarded to M.c. Dean, Inc. by ENDIST Baltimore (US Army Corps of Engineers) on September 30, 2021.

How much is contract W912DR21C0023 worth?

The government has obligated $209,947,660 on W912DR21C0023. Its potential value, with all options, is $210,427,660.

Was contract W912DR21C0023 competed?

The extent of competition for W912DR21C0023 was full and open competition. The government received 2 offers.

On GovTribe

See this award's full record

  • Every transaction and funding action
  • The awardee's other awards and teaming partners
  • Similar awards and recompete opportunities
  • Ask GovTribe AI about this award