Fabricate Fish Weir Passage - Foster Dam Oregon
Added: May 05, 2017 12:05 pm The purpose of this project is to improve downstream fish passage at Foster dam with a new Fish Weir. The features of work include an improved weir that operates with flows of 300 cfs to 860 cfs, tee (3) new stoplogs, and the demolition of an existing fish crane. The fish weir will be installed in existing spillway stoplog slots and will pass water onto the spillway tough an approximate opening of 14ft x 9ft. The weir can be constructed offsite. The weight of the new weir is limited by the lifting capacity of the deployment truck-crane on the bridge overhead; the weir is designed to weigh less than 22,000lbs. The new stoplogs will be deployed below the fish weir to set it at elevations required to pass desired flowrates during low and high pool. W9127N-17-R-0057 Department of the Army Corps of Engineers Engineering District Portland
Award Notice 2/3 5/5/17, 12:05 PM US Moorings Dock Replacement
Added: Aug 03, 2017 12:35 pm Request for Information:General. This is a REQUEST FOR INFORMATION from all business firms and is for informational/market research purposes only. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.Project Description. The U.S. Army Corps of Engineers, Portland District, has been tasked to solicit a contract for the US Moorings project located at the Portland Harbor in Portland, Oregon.The US Moorings project consists of the construction of a replacement dock at Willamette River mile 6, just upstream of the St. Johns Bridge. The site and circumstances offer a number of challenges in design and construction including a historical industrial site, difficult marine environment, and the pending remedy of contamination within the larger Portland Harbor Superfund site. USACE is seeking input from Contractors on meeting these challenges.Construction activities are anticipated to begin the summer of 2020. The in-water work period for the Willamette River (Mouth to Willamette Falls) is from July 1- October 31.The estimated Magnitude of Construction for this project is between $10,000,000 and $25,000,000.Request for Information. For this project, the Government is interested in surveying businesses to determine the industry's capability to perform marine construction within a Superfund site.Specifically, interested parties are requested to provide project information detailing their company's experience completing the following:1. Land based construction techniques for dock construction. How can we extend an approach pier from land, and then advance to the wharf construction? The purpose of this methodology is to minimize cost and to avoid the practice of spudding down in the river.2. Water based techniques for dock construction. What techniques could be employed to minimize the use of spuds or temporary piles? Could the existing timber pilings be used for temporary mooring?3. Isolation techniques for Construction in Contaminated Areas. New dock construction, and the remedy consisting of timber pile removal, dredging and capping in contaminated areas will likely require use of the EPA Region 10 Best Management Practices for Piling Removal and Placement in Washington State (attached) or similar for the State of Oregon. What techniques\equipment do you propose to minimize the distribution of contaminated sediments during pile removal and placement?4. Cap placement beneath existing structures. Portland is considering moving forward with dock construction prior to placing a cap over contaminated sediments. What types of equipment may be employed to place a cap beneath a dock and what are the limits of effective use in terms of distance and depth of water? We have looked briefly at long-reach excavators and conveyors on floating platforms.Responses to this Request for Information must be submitted electronically (via email) SUBJECT: W9127N17R0090 US Moorings Dock. Please send to Brandon M. Lasich, Contract Specialist, at Brandon.M.Lasich@usace.army.mil in either Microsoft Word or Adobe Portable Document Format by 2:00 pm Pacific Standard Time Monday, August 21, 2017. All responses will be kept confidential.Disclaimer and Important Notes. This notice does not obligate the Government to award a contract. No reimbursement will be made for any costs associated with providing information in response to this Request for Information or any follow up information. The Government reserves the right to use information provided by respondents for any purpose deemed necessary and legally appropriate. Any organization responding to this notice should ensure that its response is complete and sufficiently detailed to allow the Government to determine the organization's qualifications to perform the work. Respondents are advised that the Government is under no obligation to acknowledge receipt of the information received or to provide feedback to respondents with respect to any information submitted. After a review of the responses a solicitation may be published in Federal Business Opportunities. However, responses to this notice will not be considered adequate responses to a solicitation.All interested firms must be registered in the System for Award Management (SAM) at https://www.sam.gov and remain current for the duration of the contract to be eligible for award of a Government contract. W9127N17R0057 Department of the Army Corps of Engineers Engineering District Portland
Award Notice 3/3 8/3/17, 12:35 PM Fish Weir, Fish Passage at Foster Dam, Oregon
This announcement is a Sources Sought Notice to gather information for planning purposesonly and is not a commitment by the Government, implied or otherwise, to issue a solicitation oraward a contract. The purpose of this sources sought is to determine market interest and thesocioeconomic status, availability and capabilities of interested parties. The Governmentintends to use responses to this sources sought notice to make an appropriate acquisitiondecision for this project. This is not a Request for Quote (RFQ).The requirement is a supply procurement to fabricate, a Fish Weir for Foster Dam, Oregon to improve downstream fish passage. The 2012 North American Industrial Classification System (NAICS) code applicable to this effort is 332312 - FabricatedStructural Metal Manufacturing, the FSC is 5450.___________________________________________________________________________SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT NOTICE1. Point of Contact name, email address, and phone number.2. CAGE Code and DUNS number.3. Business size (large or small) under NAICS 332312 (500 employees). If you are a smallbusiness, include your socioeconomic classification (e.g. 8(a), HUBZone, Veteran OwnedSmall Business (VOSB), Woman Owned Small Business (WOSB), or Service Disabled VeteranOwned Small Business (SDVOSB) if applicable.4. Statement of CapabilityProvide a statement that addresses the expertise, skills, and facilities your organization has thatsupports the capabilities needed for successful fabrication of a fish weir. Include a summary of projects that demonstrate your experience inthis type of work.Response deadline: 2:00 p.m. Pacific Standard Time 24 Feb 2017.Submit to: robbie.newland@usace.army.mil with "W9127N-17-R-0057 Fish Weir, Foster Dam, OregonPlatforms" in the subject line._________________________________________________________________________It is the potential Offeror's responsibility to monitor FedBizOps for release of any futuresolicitation that may result from this Sources Sought Notice. You must be registered in Systemfor Award Management (SAM) Database to receive a Government contract award. You mayregister at for SAM at: https://www.sam.gov/portal/public/SAM/ .The primary point of contact for this project is Mr. Robbie Newland, Contract Specialist, at 503-808-4634 or robbie.newland@usace.army.mil. The Government reserves the right to use only the internetas notification of any amendments to this solicitation.Point of Contact for small business questions or assistance is the Portland District's SmallBusiness Specialist, Carol McIntyre; carol.a.mcintyre@usace.army.mil or 503-808-4602.This summary does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. The purpose of this project is to improve downstream fish passage at Foster dam with a new Fish Weir. The features of work include an improved weir that operates with flows of 300 cfs to 860 cfs, tee (3) new stoplogs, and the demolition of an existing fish crane. The fish weir will be installed in existing spillway stoplog slots and will pass water onto the spillway tough an approximate opening of 14ft x 9ft. The weir can be constructed offsite. The weight of the new weir is limited by the lifting capacity of the deployment truck-crane on the bridge overhead; the weir is designed to weigh less than 22,000lbs. The new stoplogs will be deployed below the fish weir to set it at elevations required to pass desired flowrates during low and high pool. The existing fish crane is a concrete structure crossing the entire roadway 35 feet above the deck. Demolition and removal of the crane will allow proper positioning of the crane and will facilitate the delivery and installation of the weir and stoplogs. The demolition involves removing all equipment from the crane including all lights, hoists, gearboxes, drums, conduit, etc. Location: Foster Dam is located at river mile 37.9 on the South Santiam River at Foster, Oregon; 38.5 miles above the confluence of the North and South Santiam Rivers and approximately 25 miles southeast of Albany, Oregon. Timeframe: Fabrication is anticipated to begin in October 2017 with a completion date no later than March 1st, 2018. W9127N-17-R-0057 Department of the Army Corps of Engineers Engineering District Portland
Pre-Solicitation 1/3 2/9/17, 3:56 PM