Fish Weir, Fish Passage at Foster Dam, Oregon
Pre-Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- W9127N-17-R-0057
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 332312 Fabricated Structural Metal Manufacturing
- PSC
- Not on record
- Place of performance
- Foster Dam is located at river mile 37.9 on the South Santiam River at Foster, Oregon 38.5 miles above the confluence of the North and South Santiam Rivers and approximately 25 miles southeast of Albany, Oregon. Foster Or 97345 USA
Notice details come from SAM.gov. Updated .
Notice text
This announcement is a Sources Sought Notice to gather information for planning purposes
only and is not a commitment by the Government, implied or otherwise, to issue a solicitation or
award a contract. The purpose of this sources sought is to determine market interest and the
socioeconomic status, availability and capabilities of interested parties. The Government
intends to use responses to this sources sought notice to make an appropriate acquisition
decision for this project. This is not a Request for Quote (RFQ).
The requirement is a supply procurement to fabricate, a Fish Weir for Foster Dam, Oregon to improve downstream fish passage.
The 2012 North American Industrial Classification System (NAICS) code applicable to this effort is 332312 - Fabricated
Structural Metal Manufacturing, the FSC is 5450.
___________________________________________________________________________
SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT NOTICE
1. Point of Contact name, email address, and phone number.
2. CAGE Code and DUNS number.
3. Business size (large or small) under NAICS 332312 (500 employees). If you are a small
business, include your socioeconomic classification (e.g. 8(a), HUBZone, Veteran Owned
Small Business (VOSB), Woman Owned Small Business (WOSB), or Service Disabled Veteran
Owned Small Business (SDVOSB) if applicable.
4. Statement of Capability
Provide a statement that addresses the expertise, skills, and facilities your organization has that
supports the capabilities needed for successful fabrication of a fish weir. Include a summary of projects that demonstrate your experience in
this type of work.
Response deadline: 2:00 p.m. Pacific Standard Time 24 Feb 2017.
Submit to: robbie.newland@usace.army.mil with "W9127N-17-R-0057 Fish Weir, Foster Dam, Oregon
Platforms" in the subject line.
_________________________________________________________________________
It is the potential Offeror's responsibility to monitor FedBizOps for release of any future
solicitation that may result from this Sources Sought Notice. You must be registered in System
for Award Management (SAM) Database to receive a Government contract award. You may
register at for SAM at: https://www.sam.gov/portal/public/SAM/ .
The primary point of contact for this project is Mr. Robbie Newland, Contract Specialist, at 503-808-
4634 or robbie.newland@usace.army.mil. The Government reserves the right to use only the internet
as notification of any amendments to this solicitation.
Point of Contact for small business questions or assistance is the Portland District's Small
Business Specialist, Carol McIntyre; carol.a.mcintyre@usace.army.mil or 503-808-4602.
This summary does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships.
The purpose of this project is to improve downstream fish passage at Foster dam with a new Fish Weir. The features of work include an improved weir that operates with flows of 300 cfs to 860 cfs, three (3) new stoplogs, and the demolition of an existing fish crane. The fish weir will be installed in existing spillway stoplog slots and will pass water onto the spillway through an approximate opening of 14ft x 9ft. The weir can be constructed offsite. The weight of the new weir is limited by the lifting capacity of the deployment truck-crane on the bridge overhead; the weir is designed to weigh less than 22,000lbs. The new stoplogs will be deployed below the fish weir to set it at elevations required to pass desired flowrates during low and high pool. The existing fish crane is a concrete structure crossing the entire roadway 35 feet above the deck. Demolition and removal of the crane will allow proper positioning of the crane and will facilitate the delivery and installation of the weir and stoplogs. The demolition involves removing all equipment from the crane including all lights, hoists, gearboxes, drums, conduit, etc.
Location:
Foster Dam is located at river mile 37.9 on the South Santiam River at Foster, Oregon; 38.5 miles above the confluence of the North and South Santiam Rivers and approximately 25 miles southeast of Albany, Oregon.
Timeframe:
Fabrication is anticipated to begin in October 2017 with a completion date no later than March 1st, 2018.
Files
| File | Type | Posted |
|---|---|---|
| A.01.13_Missing_Drawings.pdf | ||
| A.07.24_Solicitation_Amendment_W9127N17B00180001.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| US Moorings Dock Replacement | Award Notice | |
| Fabricate Fish Weir Passage - Foster Dam Oregon | Award Notice | |
| This notice | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity