Definitive Contract 697DCK26C00156
- Not listed
- <p>The Department of Transportation Federal Aviation Administration Headquarters awarded a $42,025,881.51 Definitive Contract on a Firm Fixed Price basis to Archer Western Construction LLC, a subsidiary of The Walsh Group, for the construction of a new air traffic control tower and terminal radar approach control facility in Greensboro, North Carolina. The contract was awarded on September 25, 2018, with a completion date of May 28, 2021. This contract did not have a set-aside designation.</p>
- The Federal Aviation Administration Southwestern Region awarded a $74.426 million definitive contract to Walsh Federal LLC on June 17, 2026, for design and construction of a new Airport Traffic Control Tower and Base Building at Grand Forks International Airport in North Dakota under firm fixed price, lowest price technically acceptable source selection. The originating solicitation (697DCK-26-R-00034) called for construction of the ATCT building, electronic and IT infrastructure, perimeter...
- The U.S. Federal Aviation Administration (FAA) awarded a $2,222,884.68 definitive, firm-fixed-price contract to Martinez Services, Inc., doing business as Martinez Construction Services, for the demolition of the Greensboro (GSO) Air Traffic Control Tower (ATCT) and the replacement of the ATCT and Terminal Radar Approach Control (TRACON) facility. This 8(a) sole source contract has a completion date of February 20, 2025. Martinez Construction Services is a small disadvantaged business that holds...
- M.c. Dean, Inc., a large business federal contractor headquartered in McLean, Virginia, was awarded a $81,194.22 firm fixed-price delivery order by the Federal Aviation Administration's Air Traffic Organization for Phase 1 site survey and design services at the Greenville-Spartanburg Air Traffic Control Tower/Terminal Radar Approach Control facility located in Greer, South Carolina. The award, issued on November 4, 2021, carries an ultimate completion date of August 14, 2029 and was not...
- The Department of Transportation Federal Aviation Administration (FAA) awarded a firm fixed-price definitive contract to Airfield Western LLC, a small business, to construct concrete foundations for antenna towers and a building foundation at an airport in Greer, South Carolina. The $484,502.85 contract is part of the FAA's broader efforts to modernize airport infrastructure and navigational aids across the country. As a prime contractor, Airfield Western has previously delivered similar...
- This is a $65,853,248.69 Definitive Contract awarded by the Federal Aviation Administration (FAA) to Archer Western Construction LLC for the construction of an Airport Traffic Control Tower Facility at the Charlotte-Douglas International Airport in Charlotte, North Carolina. The contract was awarded on January 6, 2016 and has an ultimate completion date of August 31, 2019. This contract was not set aside for any specific business categories. The prime contractor, Archer Western Construction, has...
- The Department of Transportation Federal Aviation Administration Headquarters awarded a $456,312 definitive contract to J Wayne Poole Inc. as the prime contractor to relocate the local and ground controls from the old existing Air Traffic Control Tower to the new Remote Tower Building site at Piedmont Triad International Airport in Greensboro, North Carolina. The firm fixed price contract will be performed in Greensboro, North Carolina from March 11, 2022 through April 30, 2023. The contract was...
- Greater Southwest Constructors Inc., a small business contractor based in Weatherford, Texas, has been awarded a $2.66 million firm fixed-price contract by the Federal Aviation Administration to construct self-supporting antenna towers at the Charleston, South Carolina remote communications air-ground and remote transmitter/receiver tower replacement site. This total small business set-aside contract, awarded on August 22, 2024, encompasses design and construction services in accordance with...
- The Federal Aviation Administration awarded a $275,312.20 definitive contract to Deep Reflection, Inc., a service-disabled veteran-owned small business, for facility maintenance at Greenville-Spartanburg Air Traffic Control Tower in Greer, SC, on October 18, 2022. The contract is firm fixed price with no set-aside category applied. Place of performance is Greer, SC. The period of performance runs through October 31, 2027. Deep Reflection, Inc. holds current SBA certifications as both a...
- This is a firm fixed-price delivery order awarded by the Department of Transportation Federal Aviation Administration (FAA) to SourceAmerica, a national nonprofit that creates job opportunities for people with significant disabilities. The contract is for janitorial services at the FAA Airport Traffic Control Tower at Greenville-Spartanburg International Airport, with a potential value of $109,634.16 and a completion date of October 31, 2022. The contract was awarded on September 21, 2020 and...
The Federal Aviation Administration awarded a $56.1 million firm fixed-price definitive contract to Brasfield & Gorrie LLC for construction of a new Airport Traffic Control Tower and Terminal Radar Approach Control facility at Greenville-Spartanburg International Airport on August 27, 2026, under full-and-open competition with no set-aside. Work is performed in Greer, SC. The scope includes a 187-foot tall ATCT with a 12-sided cab at 173-foot floor height, a single-story base building of approximately 17,868 square feet, and site improvements across 5 acres. The facility will be constructed to International Building Code Risk Category IV standards and will include foundations supported by driven piles, a Fiber Optic Transmission System, and a new Radio Receiver site. The FAA will furnish generators, switchboards, power systems, and transfer switches; the contractor is responsible for permitting, airport coordination, and regulatory compliance. The contract runs through July 20, 2029. NAICS code is 236220 (Commercial and Institutional Building Construction). The originating pre-solicitation was posted September 3, 2025, with capability statement due September 17, 2025; the procurement was structured as design-bid-build with an original estimated construction cost range of $10 million to $40 million and a 732-calendar-day project timeline with construction award anticipated in May 2026 and completion expected in August 2028.
Name | Description | Solicitation Number | FederalAgency | Type | PostedDate |
|---|---|---|---|---|---|
GREENVILLE - SPARTANBURG (GSP) ATCT REPLACEMENT | 697DCK-26-R-00015 | Department of Transportation Federal Aviation Administration Southwestern Region | Pre-Solicitation 1/1 | 9/3/25, 5:15 PM |
Mod # | Description | ReasonForModification | Federal Obligation | Date |
|---|---|---|---|---|
| Not listed | Not listed | $56.1m | 8/26/26 |