Willard Asphalt Paving, Inc.
Lebanon, MO Doing business as Willard Asphalt Paving Inc. Willard Asphalt Paving, Inc.
- UEI
- HFE3RNNM2QD6
- CAGE
- 0R5G6
- Primary NAICS
- 237310 Highway, Street, and Bridge Construction
- SAM.gov registration
- Active through
Company facts
- Self-certified in SAM.gov
- Entity structure
- Corporate Entity (Not Tax Exempt)
- NAICS codes registered in SAM.gov
- SAM.gov registration date
- Physical address
- 22070 Hwy Mm, Lebanon, MO 65536, USA
Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .
Recent federal awards
| Award | Agency | Obligated | Awarded |
|---|---|---|---|
| The purpose of this delivery order is to paint the heli pad building #353. | MICC Fort Leonard Wood | $15,000 | |
| Repair failed sections on michigan AVE | MICC Fort Leonard Wood | $19,973 | |
| The purpose of this delivery order is to reimburse bond cost to the contractor. | MICC Fort Leonard Wood | $6,000 | |
| The purpose of this delivery order is to reimburse bond cost for orders 25FA303, 318, 355, 362, 368, 371, 188P00001. | MICC Fort Leonard Wood | $2,634 | |
| The purpose of this delivery order is to have replacement AVE repaved. | MICC Fort Leonard Wood | $241,025 |
About Willard Asphalt Paving, Inc.
Willard Asphalt Paving Inc., a small business subchapter S corporation headquartered in Lebanon, Missouri, provides asphalt paving, repair, resurfacing, and striping services to the Department of the Army as a prime contractor, operating predominantly under Total Small Business set-asides on two major indefinite delivery/indefinite quantity vehicles at Fort Leonard Wood, Missouri.
Willard Asphalt Paving's federal footprint is sharply concentrated with a single customer. The Department of the Army Installation Management Command Northeast Region accounts for 488 of 811 prime awards (60% of the portfolio) and $218.4 million of the $235.8 million combined potential value (93% of total dollars). The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Leonard Wood places a distant second with 169 awards and $10.9 million in potential value, while remaining Army components and the Defense Finance and Accounting Service account for the remaining 7%. This concentration reflects Willard Asphalt Paving's dominant position as the infrastructure maintenance contractor for Fort Leonard Wood and the surrounding Lake of the Ozarks Recreational Area.
The vendor holds two major IDIQ vehicles. The most recent, awarded November 15, 2024, carries a $80.6 million ceiling through November 2029 and is designated as a Total Small Business single-award contract; as of the snapshot, 23 delivery orders under this vehicle range from $60 to $1.31 million for work including street paving (Minnesota Avenue, Nebraska Avenue, 1st Street, Buckeye Street, Morgan Road, Nation Avenue), parking lot and building resurfacing, motorcycle training course paving, runway crack sealing, culvert replacement, and RV park infrastructure. The predecessor IDIQ, awarded September 2021, carried a $20.6 million ceiling through September 2024 and generated numerous delivery orders across the same scope. Both vehicles are single-award, small business set-aside contracts issued by the Army Installation Management Command Northeast Region and funded by Army Materiel Command, Army Training and Doctrine Command, and Installation Management Command. Individual delivery orders are firm fixed-price with performance periods typically three to eight months.
Award activity has grown significantly. The vendor received 13 awards in 2022, 17 in 2023, 8 in 2024, and 27 in 2025. The five largest parent IDIQs (W911S710D0015, W911S704D0009, W911S713D0006, W911S706D0015, W911S709D0004) collectively generated 394 task orders worth approximately $27.6 million in combined potential value. The vendor's work is classified primarily under Highway, Street, and Bridge Construction (NAICS 234110, 377 awards) and Asphalt Paving Mixture and Block Manufacturing (NAICS 324121, 363 awards); PSC codes track to maintenance of highways, roads, streets, bridges, and railways (325 awards under PSC Z201).
Willard Asphalt Paving carries minimal sub-award footprint. The source identifies one sub-award: an April 2025 asphalt services delivery under a Dawson Mcg, Inc. prime contract for CDTF operations and maintenance.
The vendor requires performance capability to self-perform at least 50 percent of work under the current IDIQ. Combined obligated dollars across all awards total $96.1 million (41% of the combined potential value), indicating that roughly 59% of ceiling capacity remains unobligated and available for future task orders through the IDIQ expiration dates.
Quick answers
What is Willard Asphalt Paving, Inc.'s UEI?
Willard Asphalt Paving, Inc.'s Unique Entity ID (UEI) in SAM.gov is HFE3RNNM2QD6.
What is Willard Asphalt Paving, Inc.'s CAGE code?
Willard Asphalt Paving, Inc.'s CAGE code is 0R5G6.
What is Willard Asphalt Paving, Inc.'s primary NAICS code?
Willard Asphalt Paving, Inc.'s primary NAICS code is 237310 (Highway, Street, and Bridge Construction).
Where is Willard Asphalt Paving, Inc. located?
Willard Asphalt Paving, Inc.'s physical address in SAM.gov is 22070 Hwy Mm, Lebanon, MO 65536, USA.
Is Willard Asphalt Paving, Inc. registered in SAM.gov?
Yes. Willard Asphalt Paving, Inc.'s SAM.gov registration is active through June 15, 2027.
What is Willard Asphalt Paving, Inc.'s most recent federal award?
Willard Asphalt Paving, Inc.'s most recent federal contract award is The purpose of this delivery order is to paint the heli pad building #353 (W911S726FA153), from MICC Fort Leonard Wood, on May 14, 2026.
On GovTribe
See Willard Asphalt Paving, Inc.'s full federal record
- Federal contract awards
- IDV awards
- Subcontracting relationships
- Funding analysis by agency, NAICS and set-aside
- Similar vendors