Veracity Nuclear, LLC

Lenoir City, TN

UEI
U8C8MCVHS5B4
CAGE
994Y2
Primary NAICS
541330 Engineering Services
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • For Profit Organization
  • Limited Liability Company
Entity structure
Partnership or Limited Liability Partnership
SAM.gov registration date
Physical address
1488 Blackberry Ridge Rd, Lenoir City, TN 37772, USA
Founded
2021
Employees
1-10
Estimated annual revenue
$0-$1M
Industry
  1. Industrials
  2. Capital Goods
  3. Construction & Engineering
  4. Civil Engineering
SIC code
87 Engineering & Management Services
Profiles

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Contract obligations by fiscal year

Fiscal year Obligated
FY2027 To date $0
FY2026 $78,892
FY2025 $65,220
FY2024 $150,000

Top agencies by obligations

Rank Agency Obligated, FY2026–FY2027 Share
1 Nuclear Regulatory Commission $78,892

Contract awards

Contract subawards

Prime contractor Prime award Amount Awarded
Ut-Battelle LLC MANAGEMENT AND OPERATION OF THE OAK RIDGE NATIONAL LABORATORY HFIR PVR VERA/MPACT Analysis DEAC0500OR22725 $200,000

Grant awards

Latest 5 listed here. See the rest on GovTribe.

Similar vendors

About the company

Veracity Nuclear, LLC, a Tennessee-based for-profit limited liability company, provides advanced nuclear reactor core simulation, optimization, and computational methods to federal agencies as a prime contractor on sole-source and competitive purchase orders and as a research grant recipient. The vendor competes in full-and-open (no set-aside) posture across both contract and grant channels.

Veracity Nuclear specializes in high-fidelity nuclear reactor core analysis software development and deployment. The vendor holds an exclusive license to work on the F6/PARCS (FORMOSA/Purdue Advanced Reactor Core Simulator) software platform, which optimizes pressurized water reactor core loading patterns and integrates with core analysis software used throughout the nuclear industry. Recent prime contract work includes a $215,220 sole-source purchase order from the Nuclear Regulatory Commission (awarded August 7, 2024, completion December 30, 2025) to improve and expand F6/PARCS capabilities into a production-level tool for PWR core optimization, and a $78,892 firm fixed-price purchase order from the NRC (awarded August 26, 2026, completion August 25, 2027) to advance F6/PARCS to production status and support license application reviews for pressurized water reactors with high-burnup and extended enrichment fuel loading. The vendor's NRC sole-source designations reflect the specialized nature of F6 software licensing and the absence of competing vendors with equivalent technical capability.

Veracity Nuclear's customer base concentrates heavily on the Department of Energy's Office of Science, which accounts for eight awards (all federal grants under CFDA 81.049, the Office of Science Financial Assistance Program), with the NRC accounting for two contract awards valued at $294,000 combined potential value. The vendor acts as prime on nine of ten recent awards (90%) and as a subcontractor on one active task — a sub-award under UT-Battelle LLC's Oak Ridge National Laboratory HFIR (High Flux Isotope Reactor) management and operations contract, performing VERA/MPACT analysis work (awarded July 1, 2026). Across the DOE Office of Science grant portfolio, Veracity Nuclear has received project grants for production-class high-fidelity nuclear reactor simulation leveraging advanced computing libraries, boiling water reactor lifetime extensions enabled through advanced computing, optimization of high-burnup light water reactor cores within fuel performance limits (a $206,500 grant awarded July 22, 2024), high-fidelity nuclear reactor core simulation for efficient microreactor design (a $200,000 grant awarded February 12, 2024), machine learning methods for early CIPS detection, and deployment of advanced scientific computing research software. Activity has remained steady at two to three awards per year over the past four years, with one award (the NRC August 26, 2026 purchase order) reaching ultimate completion within the next twenty-four months.

Quick answers

Is Veracity Nuclear, LLC registered in SAM.gov?

Yes. Veracity Nuclear, LLC's SAM.gov registration is active through October 9, 2027.

How much has Veracity Nuclear, LLC received in federal contracts?

Federal contracts obligated $65,220 to Veracity Nuclear, LLC in fiscal year 2025 and $294,112 in fiscal years 2023 through 2027.

What is Veracity Nuclear, LLC's most recent federal award?

Veracity Nuclear, LLC's most recent federal contract award is To improve F6/parcs to production-level status to assist in efficient license application reviews for pwrs with… (31310026P0015), from NRC Central Office, on August 26, 2026.

On GovTribe

See Veracity Nuclear, LLC's full federal record

  • Federal contract awards
  • Federal grant awards
  • Subcontracting relationships
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors