Small Diameter Bomb Increment I (SDB)

DoD acquisition program

Program facts

Program number
354
Short name
SDB I
Program type
Other
Acquisition pathway
Major Capability Acquisition (MCA)
Acquisition category
ACAT II
Lead component
Contract awards
128
Contract obligations
$1,943,074,254 Since fiscal year 2004

Program details come from the Department of Defense's acquisition program list. Contract figures come from SAM.gov (formerly FPDS).

Contract obligations by fiscal year

Fiscal year Obligated
FY2026 $13,930,551
FY2025 $4,169,590
FY2024 $39,795,237
FY2023 $6,216,099
FY2022 $11,506,884
FY2021 $3,335,936
FY2020 $2,266,890
FY2019 $10,371,091
FY2018 $22,622,531
FY2017 $18,015,753

Top contractors by obligations

Rank Contractor Obligated Share
1 The Boeing Company $1,113,517,169
2 Raytheon Company UEI VTEWM5QSE598 $788,913,415
3 Raytheon Company UEI K1H5GGQPBLV5 $30,690,072
4 BAE Systems Technology Solutions & Services Inc. $6,029,242
5 Alliant Techsystems Operations LLC $858,428
6 Accumet Materials Co LLC $781,425
7 The Hon Company Llc $377,582
8 Modern Technology Solutions, Inc. $346,654
9 Applied Research Associates, Inc. $298,068
10 Aeronix, Inc. $282,436

10 of 24 contractors listed here. See the rest on GovTribe.

Contract awards

Award Awarded Obligated
The small diameter bomb increment i weapon system consists of a precision-guided all-up round, a carriage system… FA821324FB019 · The Boeing Company · AFLCMC Hill AFB $3,216,736
Requirement for B21 lab integration assets. Including 12-pack rack assemblies, weapon modules, test vehicles… FA821324FB002 · The Boeing Company · AFLCMC Hill AFB $26,381,173
Small diameter bomb (SDB) i - container lid repairs FA867214D0007-0007 · The Boeing Company · AFLCMC Eglin AFB $696,084
DEF FA867211D0107-0026 · Raytheon Company · AFLCMC Eglin AFB $1,499,673
Small diameter bomb i sustaining engineering CY14/CY15 FA867214C0010 · The Boeing Company · AFLCMC Eglin AFB $32,878,731
SDB i - joint munition effectiveness manual weaponeering system support (JWS) FA867214D0007-0004 · The Boeing Company · AFLCMC Eglin AFB $9,212
Small diameter bomb-i f-16 block 40-52 system support FA867214D0007-0001 · The Boeing Company · AFLCMC Eglin AFB $324,037
Guided test vehicle (GTV) recertification FA867214D0007-0005 · The Boeing Company · AFLCMC Eglin AFB $0
SDB II phase 1 edrap FA867211D0107-0024 · Raytheon Company · Defense Contract Management Agency $577,742
F-35 technical support FA867214D0007-0003 · The Boeing Company · AFLCMC Eglin AFB $69,601
Small diameter bomb II test assets FA867211D0107-0025 · Raytheon Company · AFLCMC Eglin AFB $54,908,419
Joint miniature munitions bomb rack unit associate contractor agreement for support FA867214D0007-0002 · The Boeing Company · AFLCMC Eglin AFB $41,258
Sweden gtvs FA868108D0113-0010 · The Boeing Company · AFLCMC Eglin AFB $441,245
Fuze forty foot (40') drop test FA867211D0107-0019 · Raytheon Company · AFLCMC Eglin AFB $88,483
JMM BRU system support FA867211D0107-0023 · Raytheon Company · AFLCMC Eglin AFB $2,743,836
Saudi weapons site survey FA868108D0113-0009 · The Boeing Company · AFLCMC Eglin AFB $0
Lsdb GTV and conversion FA865614C0083 · The Boeing Company · AFLCMC Eglin AFB $130,956
Should cost initiative study FA867211D0107-0020 · Raytheon Company · Defense Contract Management Agency $757,988
Container RE-design FA867211D0107-0018 · Raytheon Company · AFLCMC Eglin AFB $117,196
Integrated flight simulation (IFS) training and training materials FA867211D0107-0021 · Raytheon Company · AFLCMC Eglin AFB $314,005
Program support review FA867211D0107-0015 · Raytheon Company · Defense Contract Management Agency $148,992
Small diameter bomb i separation test vehicle recalibrations (f-35 JPO) FA867209D0062-0036 · The Boeing Company · AFLCMC Eglin AFB $167,900
Engineering support for combat net radio (CNR) network planner FA867213M0244 · Aeronix, Inc. · AFLCMC Eglin AFB $282,436
Tacnet weapon data link and cable assembly FA867213M0240 · Rockwell Collins, Inc. · Defense Contract Management Agency $44,416
Weapon system simulator (WSS) FA867211D0107-0017 · Raytheon Company · Defense Contract Management Agency $1,205,080
UCA for 21 BRU-61A carriage systems for IAF FA868110D0071-0008 · The Boeing Company · AFLCMC Eglin AFB $3,171,000
STV recalibration FA867209D0062-0035 · The Boeing Company · AFLCMC Eglin AFB $4,375
CNU-660/e container redesign FA867209D0062-0033 · The Boeing Company · AFLCMC Eglin AFB $240,445
Joint miniature munitions bomb rack unit (JMM BRU) FA867213C0199 · Raytheon Company · AFLCMC Eglin AFB $30,690,072
Norway tactical training FA868108D0113-0008 · The Boeing Company · AFLCMC Eglin AFB $2,491,249
STV recalibrations FA867209D0062-0032 · The Boeing Company · AFLCMC Eglin AFB $4,375
Amod was performed by the ACO to deobligate cancelling funds. Contracting activity is just performing MOD to reflect… FA868106C0228 · The Boeing Company · AFLCMC Eglin AFB $0
F-22 support FA867209D0062-0034 · The Boeing Company · AFLCMC Eglin AFB $475,767
F-16 block 25/30/32 follow-on support FA867209D0062-0031 · The Boeing Company · AFLCMC Eglin AFB $662,020
Navy peculiar support equipment SDB II FA867211D0107-0016 · Raytheon Company · AFLCMC Eglin AFB $309,787
System protection FA867211D0107-0009 · Raytheon Company · AFLCMC Eglin AFB $1,246,214
2 each SDB ADU-890 FA868113M0041 · Alliant Techsystems Operations LLC · AFLCMC Eglin AFB $203,457
Uttr additional site test FA867211D0107-0014 · Raytheon Company · AFLCMC Eglin AFB $440,456
NRE FA867209D0062-0030 · The Boeing Company · AFLCMC Eglin AFB $7,690,475
Design of experiment (DOE) FA867211D0107-0013 · Raytheon Company · AFLCMC Eglin AFB $591,334
Reliability statistical modeling tool FA867211D0107-0012 · Raytheon Company · AFLCMC Eglin AFB $96,570
Operational targeting source interoperabiity FA867211D0107-0011 · Raytheon Company · Defense Contract Management Agency $825,229
Metal podwer tungsten FA867212C0330 · Accumet Materials Co LLC · AFLCMC Eglin AFB $781,425
AC-130W follow on support FA867209D0062-0029 · The Boeing Company · AFLCMC Eglin AFB $1,721,011
AC-130J integration FA867209D0062-0028 · The Boeing Company · AFLCMC Eglin AFB $318,132
UH-1N purchase parts for support of SDB II increment II FA867212M0371 · CSG Parts, LLC · AFLCMC Eglin AFB $22,750
PM support FA868110D0071-0007 · The Boeing Company · AFLCMC Eglin AFB $7,793,009
PMR support FA867211D0107-0010 · Raytheon Company · Defense Contract Management Agency $501,916
IFS trade studies support FA867211D0107-0008 · Raytheon Company · AFLCMC Eglin AFB $362,920
ACA support for the BRU-61/a FA867209D0062-0027 · The Boeing Company · AFLCMC Eglin AFB $1,848,619
Show 40 more

Latest 50 of 128 listed here. See the rest on GovTribe.

About this program

The Small Diameter Bomb Increment I (SDB I) is an Acquisition Category II Major Capability Acquisition program managed by the Department of Defense. This weapons system program encompasses the development, production, and sustainment of precision-guided munitions designed for integration across multiple aircraft platforms including the F-16, F-22, F-35, and AC-130. The program's scope includes not only the munitions themselves but also associated delivery systems, test assets, training equipment, and aircraft integration efforts.

Contract awards under this program typically range from small purchase orders of $6,440 to major production contracts exceeding $150 million, with performance periods spanning from a few months to nearly 10 years. The primary contractors are Boeing and Raytheon Company, with key subcontractors including BAE Systems, Honeywell Aerospace, and Creation Technologies New Mexico. The majority of contracts are awarded through the Air Force Life Cycle Management Center at Eglin Air Force Base, predominantly using firm-fixed-price and cost-plus-fixed-fee contract types. Deliverables include production lots of munitions, bomb rack units, test vehicles, simulation systems, engineering services, and sustainment support. While most contracts have no set-aside designation, there are occasional small business and 8(a) set-asides for smaller components and services. The program has a significant foreign military sales component, with contracts supporting integration and delivery to Israel, Sweden, Norway, and the Netherlands.

Quick answers

What is SDB I?

Small Diameter Bomb Increment I (SDB) (SDB I) is a DoD acquisition program led by the Air Force. DoD lists its program type as Other. It follows the Major Capability Acquisition (MCA) pathway and is ACAT II.

How much has SDB I obligated on contracts?

128 contract awards are coded to SDB I, and their actions have obligated $1,943,074,254 since fiscal year 2004.

Who are the top contractors on SDB I?

The contractors obligated the most on SDB I contracts are The Boeing Company ($1,113,517,169), Raytheon Company ($819,603,487 across 2 registrations) and BAE Systems Technology Solutions & Services Inc. ($6,029,242).

How much did SDB I obligate in fiscal year 2025?

Contracts coded to SDB I obligated $4,169,590 in fiscal year 2025.

What is the latest contract award for SDB I?

The latest contract award coded to SDB I is FA821324FB019, awarded to The Boeing Company on September 9, 2024.

On GovTribe

See this program's full record

  • Every contract award coded to this program
  • Funding analysis by contractor, agency, place of performance and set-aside
  • Alerts for new awards
  • Ask GovTribe AI about this program