F-22 Raptor Advanced Tactical Fighter Aircraft

Major Defense Acquisition Program (MDAP)

Program facts

Program number
265
Short name
F-22
Acquisition pathway
Major Capability Acquisition (MCA)
Acquisition category
ACAT IC
Acquisition status
Full operational capability or full deployment (FOC/FD)
Lead component
Contract awards
138
Contract obligations
$38,243,229,167 Since fiscal year 2003

Program details come from the Department of Defense's acquisition program list. Contract figures come from SAM.gov (formerly FPDS).

Contract obligations by fiscal year

Fiscal year Obligated
FY2026 $129,285,980
FY2025 $132,360,609
FY2024 $123,931,134
FY2023 $108,809,544
FY2022 -$12,383,355
FY2021 $2,398,791
FY2020 -$17,170,446
FY2019 -$11,584,523
FY2018 $42,357,732
FY2017 $1,806,072,186

Top contractors by obligations

Rank Contractor Obligated Share
1 Lockheed Martin Corporation UEI G4KDGE4JFFK7 $32,686,169,386
2 RTX Corporation $5,151,135,325
3 Lockheed Martin Aeronautical Systems Support Company $187,994,081
4 Lockheed Martin Corp $138,262,802
5 Lockheed Martin Corporation UEI KDT2YLB34NT6 $50,539,720
6 L3Harris Technologies, Inc. UEI CN7PNYLZLNV3 $12,936,275
7 Rockwell Collins Inc. $3,926,357
8 Caci Idt, LLC $2,090,366
9 L3Harris Technologies, Inc. UEI LB5KVANFKPY7 $1,945,540
10 Runsafe Security, Inc. $1,398,052

10 of 43 contractors listed here. See the rest on GovTribe.

Contract awards

Award Awarded Obligated
F-22 program support FA861124F0018 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $8,279,083
TOOL01R environmental control system / air cooled fuel cooler coatings (ECS/acfc) repair tool kits FA820526FB003 · Lockheed Martin Corporation · AFLCMC Hill AFB $2,568,328
This contract is for the manufacture, assembly, and delivery of the peculiar support equipment (PSE) end item dummy… N6833526P1058 · Integrated Procurement Technologies · Naval Air Warfare Center (NAVAIR) $1,025
Redesign, test and qualify of the AFT array rail assembly and AAE FA820526FB008 · Lockheed Martin Corporation · AFLCMC Hill AFB $5,146,736
F-22 reliability, availability, maintainability program FA820525F0703 · Lockheed Martin Corporation · AFLCMC Hill AFB $78,258,318
F-22 ares delivery order 0019 FA861123F0019 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $2,141,111
F-22 procurement of atlas FA861123F0007 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $144,749,987
Quick reaction instrumentation package FA861123F0030 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $276,684
AF233R moog switch FA820523F0527 · Lockheed Martin Corporation · AFLCMC Hill AFB $0
AF211 avsle FA820523F0513 · Lockheed Martin Corporation · AFLCMC Hill AFB $28,004,499
F-22 strategic funding increase and tactical funding increase program execution FA861123C0001 · Runsafe Security, Inc. · AFLCMC Wright Patterson AFB $1,398,052
F-22 technology maturation FA861123F0017 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $38,824,476
This order is issued an undefinitized contract action (UCA) for execution year 1 on clins 0077 and 0619, f-22 bulk… FA820523F0514 · Lockheed Martin Corporation · AFLCMC Hill AFB $69,988,820
Delivery Order FA861122D0001-FA861122F0005 Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $139,401,259
Purchase of cables FA825113M0278 · Newark Corporation · Air Force Sustainment Center (AFMC) $10
Acat 1, f-22, increment 3.2B phases c and d FA861113D2850-0004 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $367,465,559
M205 spares W56HZV13D0088-0001 · CCI Capco, LLC · ACC Warren $937,595
Cartridge actuated initiator FA821313M0027 · Teledyne Risi, Inc. · AFLCMC Hill AFB $87,240
F-22, acat i, air vehicle software support FA861113D2850-0003 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $77,836,388
Acat i, f-22, increment 3.1 and 3.2A cost and software data reporting (csdr) FA861113D2850-0002 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $327,468
F-22, fcat 1, program integration, requirements analysis and systems engineering FA861113D2850-0001 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $32,059,137
Acat i, f-22, external tank / pylon wing cover F3365702D0009-0090 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $2,878,099
Acat i, f-22, CTF operations and support for CY 13 and CY 14 F3365702D0009-0088 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $65,277,368
Brush assembly FA825113M0056 · White Aero Inc. · Air Force Sustainment Center (AFMC) $600
Acat i, f-22, KOV - 20 off ramp F3365702D0009-0077 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $24,144,610
To purchase impulse cartridges, thruster cartridges, aircraft canopy remover & propellant initiator for the f-22… FA821312C0084 · Rockwell Collins Inc. · Defense Contract Management Agency $1,497,137
Pointer FA825112M0378 · Regal Air, Inc. · Air Force Sustainment Center (AFMC) $4,900
Non-acat access a & as F22 fighter-bomber FA862212D8007-0002 · Caci Idt, LLC · AFLCMC Wright Patterson AFB $2,090,366
Purchase 106 EA of NSN 1377-01-488-1068 ES cartridge actuated initiator for the f-22. FA821312M0035 · Pacific Scientific Energetic Materials Company (California) LLC · Defense Contract Management Agency $136,210
Acat 1, F22, INC 3.1, retrofit F3365702D0009-0076 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $67,940,211
Acat i, f-22, test aircraft instrumentation F3365702D0009-0084 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $4,206,896
P/n: 768939-1 clip FA825112M0181 · Chrisbarry Aircraft Corp · Air Force Sustainment Center (AFMC) $1,500
Court reporting transcriptions FA861112C2900 · Esquire Deposition Services, LLC · Defense Contract Management Agency $11,964
Fixed capacitor - advanced tactical fighter FA825112M0092 · Brown Helicopter, Inc. · Air Force Sustainment Center (AFMC) $996
Key - advanced tactical fighter FA825112M0086 · Military Parts Exchange LLC · Air Force Sustainment Center (AFMC) $50
Acat 1, F22, lab infrastructure F3365702D0009-0083 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $201,987,099
Potentionmeter - advanced tactical fighter (f-22) FA825112M0076 · Amcan Instruments, Inc. · Air Force Sustainment Center (AFMC) $1,800
Angle wedge FA825112M0070 · Olympus America Inc. · Air Force Sustainment Center (AFMC) $0
Acat i, f-22, delivery order 80 F3365702D0009-0080 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $4,438,907
Acat 1, f-22, increment 3.2A phases c & d F3365702D0009-0082 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $181,231,032
Acat 1, F22, common configuration, phases 7 & 8 F3365702D0009-0075 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $211,333,977
Acat 1, f-22, trainers visual systems ugrades F3365702D0009-0074 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $23,077,004
ACAT1, F22, 3.2 hardware & test a/c upgrades F3365702D0009-0071 · Lockheed Martin Corporation · Defense Contract Management Agency $87,035,636
Increment 3.2 hardware development F3365702D0009-0070 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $76,949,084
Do 0066 - increment 3.1 hardware retrofit F3365702D0009-0066 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $81,996,309
Increment 3.2 phase b F3365702D0009-0073 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $220,660,053
Training system baseline upgrades F3365702D0009-0079 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $24,466,288
Explosives manufacturing FA821310C0078 · Rockwell Collins Inc. · AFLCMC Hill AFB $1,100,216
Madl phase a F3365702D0009-0072 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $10,310,590
Common configuration phase 6 F3365702D0009-0063 · Lockheed Martin Corporation · AFLCMC Wright Patterson AFB $69,926,708
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

About this program

The F-22 Raptor Advanced Tactical Fighter Aircraft program is a Major Defense Acquisition Program (MDAP) operating under the Major Capability Acquisition (MCA) pathway with an Acquisition Category IC designation. The program encompasses the development, production, and sustainment of the F-22 Raptor, an advanced tactical fighter aircraft for the U.S. Air Force. This acquisition program represents a comprehensive effort to deliver and maintain air superiority capabilities through advanced aviation technology, weapons systems integration, and ongoing platform modernization.

The contract awards associated with this program primarily consist of large-scale delivery orders and definitive contracts ranging from $1 million to over $500 million, with performance periods typically spanning 2-5 years. Lockheed Martin Corporation, particularly through its Aeronautics Company division, serves as the primary contractor across most awards, while Pratt & Whitney provides F119 engine sustainment services. Notable contract activities include the Follow-on Agile Sustainment to the Raptor (FASTER) program ($3.05 billion ceiling), Advanced Raptor Enhancement and Sustainment (ARES) delivery orders, and various technology maturation initiatives. The Department of the Air Force Materiel Command Aeronautical Systems Center is the predominant funding agency, with most work performed in Fort Worth, Texas, and White Settlement, Texas. While the majority of contracts have no set-aside designation, occasional small business set-asides are utilized for specialized services. Contract types vary between firm-fixed-price, cost-plus-fixed-fee, and cost-plus-incentive arrangements, reflecting the complex nature of fighter aircraft development and sustainment activities.

Quick answers

What is F-22?

F-22 Raptor Advanced Tactical Fighter Aircraft is a Major Defense Acquisition Program (MDAP) led by the Air Force. It follows the Major Capability Acquisition (MCA) pathway and is ACAT IC. Its acquisition status is full operational capability or full deployment (FOC/FD).

How much has F-22 obligated on contracts?

138 contract awards are coded to F-22, and their actions have obligated $38,243,229,167 since fiscal year 2003.

Who are the top contractors on F-22?

The contractors obligated the most on F-22 contracts are Lockheed Martin Corporation ($32,736,709,106 across 2 registrations), RTX Corporation ($5,151,135,325) and Lockheed Martin Aeronautical Systems Support Company ($187,994,081).

How much did F-22 obligate in fiscal year 2025?

Contracts coded to F-22 obligated $132,360,609 in fiscal year 2025.

What is the latest contract award for F-22?

The latest contract award coded to F-22 is FA861124F0018, awarded to Lockheed Martin Corporation on October 15, 2026.

On GovTribe

See this program's full record

  • Every contract award coded to this program
  • Funding analysis by contractor, agency, place of performance and set-aside
  • Alerts for new awards
  • Ask GovTribe AI about this program