Consolidated Rail Infrastructure and Safety Improvements Program
Active
- Assistance listing
- 20.337
- Agency
-
Federal Railroad Administration
Department of Transportation
- Grant awards
- Not on record
Program facts
- Also known as
- CRISI
- Treasury account
-
- 62-2811-0-1-401
- More information
Program details come from SAM.gov Assistance Listings. Updated .
About this program
The Federal Railroad Administration, within the Department of Transportation, solicits applications under CFDA 20.337 for projects that improve the safety, efficiency, and reliability of intercity passenger and freight rail. The most recent solicitation in the source was posted September 22, 2026, and its latest due date, October 9, 2026, has passed, so no listed opportunity is open as of November 26, 2026. The source reports 21 solicitations posted between October 10, 2025 and September 22, 2026, many labeled Congressionally Directed Spending. The source contains no grant award records or portfolio data, so it supports no statement on award cadence, funding concentration, assistance-type mix, or award values.
Eligibility is broad at the program level, covering states, political subdivisions, tribal and county governments, Amtrak and other intercity rail carriers, Class II and III railroads, rail carriers and equipment manufacturers in partnership with public entities, universities, and rail labor organizations. Individual solicitations narrow this; the Vermont Amtrak Stations Rehabilitation Phase 1 solicitation (FR-CRS-23-005) limits eligibility to the Vermont Agency of Transportation. That solicitation would fund improvements to fourteen stations' signage, parking, safety, and amenities, and its due date was September 23, 2026. The Baltimore Penn Station solicitation (FR-CRS-22-006), due September 4, 2026, would fund multimodal connections around the station.
Program preferences favor projects where the federal share of total costs is 50 percent or less, non-federal funding comes from more than one source including private sources, and the benefit-cost analysis shows net benefits. Other considerations include private sector participation, past performance, and legal, financial, and technical capacity. Applicants must submit a Project Narrative, Statement of Work, Benefit-Cost Analysis, Environmental Compliance Documentation, and the SF 424 series, and preapplication coordination is required. Funds are obligated through grants or cooperative agreements, disbursed on reimbursement, and released only as milestones are achieved. Recipients must retain records for three years after the award, and 2 CFR 200 applies.
Objective and description
- Objective
To fund projects that improve the safety, efficiency, and/or reliability of intercity passenger and freight rail systems.
- Description
This program funds projects that improve the safety, efficiency, and reliability of intercity passenger and freight rail.
Eligibility
- Applicant eligibility
Interstate, Public nonprofit institution/organization (includes institutions of higher education), Other public institution/organization, Profit organization, State (1) A State. (2) A group of States. (3) An Interstate Compact. (4) A public agency or publicly chartered authority established by 1 or more States. (5) A political subdivision of a State. (6) Amtrak or another rail carrier that provides intercity rail passenger transportation (7) A Class II railroad or Class III railroad (8) Any rail carrier or rail equipment manufacturer in partnership with at least 1 of the entities in (1) through (5). (9) The Transportation Research Board and any entity with which it contracts in the development of rail-related research, including cooperative research programs. (10) A University transportation center engaged in rail-related research. (11) A non-profit labor organization representing a class or craft of employees of rail carriers or rail carrier contractors.
- Beneficiary eligibility
(1) A State. (2) A group of States. (3) An Interstate Compact. (4) A public agency or publicly chartered authority established by 1 or more States. (5) A political subdivision of a State. (6) Amtrak or another rail carrier that provides intercity rail passenger transportation (7) A Class II railroad or Class III railroad (8) Any rail carrier or rail equipment manufacturer in partnership with at least 1 of the entities in (1) through (5). (9) The Transportation Research Board and any entity with which it contracts in the development of rail-related research, including cooperative research programs. (10) A University transportation center engaged in rail-related research.
- Uses of assistance
(1) Deployment of railroad safety technology, including positive train control and rail integrity inspection systems. (2) A capital project as defined in section 24401(2), except that a project shall not be required to be in a State rail plan developed under chapter 227. (3) A capital project identified by the Secretary as being necessary to address congestion challenges affecting rail service. (4) A capital project identified by the Secretary as being necessary to reduce congestion and facilitate ridership growth in intercity passenger rail transportation along heavily traveled rail corridors. (5) A highway-rail grade crossing improvement project, including installation, repair, or improvement of grade separations, railroad crossing signals, gates, and related technologies, highway traffic signalization, highway lighting and crossing approach signage, roadway improvements such as medians or other barriers, railroad crossing panels and surfaces, and safety engineering improvements to reduce risk in quiet zones or potential quiet zones. (6) A rail line relocation and improvement project. (7) A capital project to improve short-line or regional railroad infrastructure. (8) The preparation of regional rail and corridor service development plans and corresponding environmental analyses. (9) Any project that the Secretary considers necessary to enhance multimodal connections or facilitate service integration between rail service and other modes, including between intercity rail passenger transportation and intercity bus service or commercial air service. (10) The development and implementation of a safety program or institute designed to improve rail safety. (11) Any research that the Secretary considers necessary to advance any particular aspect of rail related capital, operations, or safety improvements; and (12) Workforce development and training activities, coordinated to the extent practicable with the existing local training programs supported by the Department of Transportation, the Department of Labor, and the Department of Education. ~96% discretionary funds (where 25% of these funds are allocated to rural areas) in FY20. 1% takedown.~80% discretionary funds (where 25% of these funds are allocated to rural areas) in FY 17 FY 17 Restrictions: $10 M of funds allocated to capital projects for initiation/restoration of service ~3% of funds allocated to Alaska, Hawaii, South Dakota, and Wyoming based on those states' rail route miles as a percentage of the nation's total rail route miles 1% takedown.
- Use restrictions
No restriction on period of time the assistance normally is available. Method of awarding/releasing assistance: Assistance is awarded upon request for reimbursement Funding is obligated through cooperative agreements or grants, and outlays occur as reimbursement. Funding will only be obligated and disbursed as milestones are achieved.
- Length and time phasing of assistance
No restriction on period of time the assistance normally is available. Method of awarding/releasing assistance: Assistance is awarded upon request for reimbursement Funding is obligated through cooperative agreements or grants, and outlays occur as reimbursement. Funding will only be obligated and disbursed as milestones are achieved.
How to apply
- Preapplication coordination
Preapplication coordination is required. Environmental impact information is not required for this program. This program is eligible for coverage under E.O. 12372, "Intergovernmental Review of Federal Programs." An applicant should consult the office or official designated as the single point of contact in his or her State for more information on the process the State requires to be followed in applying for assistance if the State has selected the program for review.
- Application procedure
2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards applies to this program. Notice of Funding Opportunities (NOFO) for this listing will be posted on Grants.gov (opens in new window) (opens in new window). Required documents for an application package are: Project Narrative, Statement of Work, Benefit-Cost Analysis, Environmental Compliance Documentation, SF424 - Application for Federal Assistance, SF 424C - Budget Information for Construction, or, for an equipment procurement project without any construction costs, or SF 424A - Budget Information for Non- Construction, SF 424D - Assurances for Construction, or, for an equipment procurement project without any construction costs, or SF 424B - Assurances for Non-Construction, and FRA's Additional Assurances and Certifications.
- Criteria for selecting proposals
FRA will give preference to: Projects where the Federal share of total project costs is 50 percent or less. Projects where the proposed non-Federal share is comprised of more than one source including private sources, demonstrated broad participation by affected stakeholders. Projects where the net benefits of the grant funds are maximized considering the benefit-cost analysis, including anticipated private and public benefits relative to the costs of the proposed project, and factoring in the other considerations described below. After applying the above preferences, FRA will take in account the key Departmental priorities. Other considerations include: the degree to which the proposed project's business plan considers potential private sector participation in the financing, construction, or operation of the project.; the recipient's past performance in developing and delivering similar projects, and previous financial contributions; whether the recipient has or will have the legal, financial, and technical capacity to carry out the proposed project; satisfactory continuing control over the use of the equipment or facilities; and the capability and willingness to maintain the equipment or facilities.
- Award procedure
Applications selected for funding will be announced in a press release and on FRA's website after the application review period. FRA will contact applicants with successful applications after announcement with information and instructions about the award process. This notification is not an authorization to begin proposed project activities. A formal grant agreement or cooperative agreement signed by both the grantee and the FRA, including an approved scope, schedule, and budget, is required before the award is considered complete.
- Time to approval or disapproval
FRA is committed to responding to applicants in a reasonable and timely manner. Response times will vary based on size, scope, complexity and volume of applications.
Grant opportunities
Show all 21
Quick answers
What is Assistance Listing 20.337?
Assistance Listing 20.337 is Consolidated Rail Infrastructure and Safety Improvements Program, a federal grant program run by Federal Railroad Administration (Department of Transportation).
What is the CFDA number for Consolidated Rail Infrastructure and Safety Improvements Program?
Its CFDA number is 20.337: Assistance Listing numbers were called CFDA numbers before 2018.
Are there open grant opportunities under 20.337?
No opportunity listed under 20.337 is open now. The latest, FY23-Vermont Amtrak Stations Rehabilitation Phase 1, was posted on September 22, 2026.
On GovTribe
See this program's full record
- Every grant award and opportunity under it
- Funding by recipient, agency and assistance type
- Alerts for new opportunities
- Ask GovTribe AI about this program