FY24 Port of Rosedale Multimodal Expansion: Great River Railroad Restoration Project

Closed Posted

Opportunity number
FR-CCD-24-010
Agency
Applications due
Award size
Up to $8,175,000

Opportunity facts

Assistance listings
Funding instrument
Grant
Category
  • Transportation
Eligible applicants
  • County Governments
Points of contact
Full announcement

Opportunity details come from Grants.gov. Updated .

About this opportunity

The Federal Railroad Administration (FRA) is seeking county government applicants for the FY24 Port of Rosedale Multimodal Expansion: Great River Railroad Restoration Project. The grant opportunity focuses on restoring functionality to a 31-mile railroad segment connecting the Port of Rosedale to the Columbus and Greenville Railroad in Metcalf, MS. Phase 1 of the project will involve comprehensive railroad infrastructure rehabilitation, including replacing approximately one-third of timber rail ties, repairing 33 grade crossings, installing supplemental ballast rock, resurfacing track, repairing 4 timber bridges, and bridge/culvert infrastructure modifications. The primary objective is to create a functional maintenance equipment track that enhances regional transportation resiliency and redundancy. While specific evaluation criteria are not detailed, the project appears to prioritize infrastructure restoration, environmental compliance, and regional transportation improvement.

The project is scheduled for implementation between October 31, 2025, and November 21, 2025, with a clear focus on the Mississippi region. While the exact award value is not specified, the project encompasses substantial infrastructure work involving 31 miles of railroad track, multiple bridge and crossing repairs, and comprehensive track rehabilitation. The place of performance will be the railroad segment between the Port of Rosedale and Metcalf, MS, with Phase 1 concentrating on immediate infrastructure repair and Phase 2 anticipated to involve more extensive track restoration, including new rail installation and siding improvements. The project represents a significant investment in regional transportation infrastructure rehabilitation.

Synopsis

This Project is part of a larger effort to restore function to the Great River Railroad that runs from the Port of Rosedale to the Columbus and Greenville Railroad (CAGY) in Metcalf, MS. The larger effort is divided into two Phases. Under this Agreement, the Project will complete environmental review for both phases. Additionally, this Project will complete preliminary engineering, final design, and construction activities for Phase 1 of the larger effort. Under this Agreement, Phase 1 activities will include preliminary engineering, final design, and construction activities to repair the 31 mile railroad to be a functional track for maintenance equipment by replacing ties (approximately one-third of the timber rail ties), repairing 33 grade crossings, installing additional supplemental ballast rock, resurfacing track, repairing 4 timber bridges, replacing 1 timber bridge with culverts, and installing 1 concrete culvert. Phase 2 of the restoration effort is anticipated to include installing approximately 31 miles of new 112-115-pound rail, additional tie replacement, the replacement of 4 bridges, and improvements to sidings (Port of Rosedale spur) in order to restore the track to a full operation. Besides environmental review, this Agreement does not fund activities for Phase 2. Successful completion of the Project will enhance resiliency and redundancy for both the Port of Rosedale and the wider region.

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar grant opportunities
  • Ask GovTribe AI about this opportunity