Zone 3 and 4 Pump Station Upgrades and Hillsborough Pump Station Electrical Upgrades
Closed State & local contract opportunity Posted
- Solicitation number
- 8893-2
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Daniel Jordan djordan@newportbeachca.gov (949) 644-3344
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Newport Beach, California Department of Public Works is requesting bids on Zone 3 and 4 Pump Station Upgrades and Hillsborough Pump Station Electrical Upgrades under a lump-sum contract, with bids due electronically September 23, 2026 at 10:00 a.m. PDT. Attendance at a mandatory pre-bid meeting on September 10, 2026 at 1:00 p.m. at Big Canyon Reservoir in Corona Del Mar is required; attendees are limited to the contractor's CEO/Owner, Superintendent, or Foreman.
All materials, equipment, and components conveying or in contact with potable water must comply with California potable water standards, NSF-61 certification, and City of Newport Beach requirements. The scope includes labor, supervision, materials, and equipment to complete both upgrade phases per Schedule A (Zone 3 and 4) and Schedule B (Hillsborough electrical) drawings. Contractors and subcontractors must hold both "A" and "C-10" electrical licenses and be registered with the California Department of Industrial Relations pursuant to Labor Code section 1725.5.
The estimated bid value is $4.015 million. A 10% bid bond, 100% performance bond, and 100% payment bond are required; the sealed original bid bond must be submitted to the City Clerk prior to bid opening. Electronic bids via PlanetBids vendor portal are the only acceptable submission method; late submissions will not be accepted. An online question-and-answer period ends September 16, 2026. Project categories include power generation equipment and pumping equipment and accessories.
Opportunity text
The scope of work for this contract includes providing all necessary labor, supervision, materials, and equipment required to complete the work for both the Zone 3 and 4 Pump Station Upgrades (Schedule A Drawings) and the Hillsborough Pump Station Electrical Upgrades (Schedule B Drawings). This is a potable water project. As such, all construction activities, materials, equipment, and components conveying or in contact with potable water must be in compliance with pertinent California potable water standards, NSF-61, and comply with all City of Newport Beach requirements for potable water.
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity