WTP SCADA and Filter Control System Improvements
Open State & local contract opportunity Posted
- Solicitation number
- PE-62250-NONST-2027-000000016
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 47101574 Sequencing batch reactor
- 47101564 Waste crusher
- 47101562 Drum screen
- 47101543 Surface aerator
- 47101569 Wastewater plane screen
- 47101547 Surface washing device
- 47101572 Disc screen
- 47101573 Flocculator
- 47101541 Ozone water treatment equipment
- 47101545 Rotating biological contactor RBC
Show all 41
- 47101528 Water treatment dryers
- 47101560 Filter underdrain equipment
- 47101553 Fiber filter
- 47101548 Filter control console
- 47101570 Oxidation ditch
- 20142600 Production control system instrumentation
- 47101517 Ultraviolet wastewater disinfection equipment
- 47101522 Packaged water treatment systems
- 47101525 Dewatering equipment
- 47101540 Chemical feeder
- 47101542 Air flotation equipment
- 47101550 Compression filter
- 47101551 Up flow filter
- 47101552 Moving bed filter
- 47101554 Jar tester
- 47101555 Baffle wall
- 47101557 Inclined plate settler
- 47101558 Foam breaker
- 47101559 Scum removal equipment
- 47101561 Adulteration treatment equipment
- 47101566 Multiple media filter
- 47101571 Chlorine gas neutralization unit
- 47101577 Flow arrangement wall
- 47101523 Collection tanks
- 47101546 Grit removal system
- 47101549 Gravity filter
- 47101563 Wastewater coalescer
- 47101556 Water trough
- 47101565 Waste gas burner
- 47101567 Electrodialysis machine
- 47101579 Fresh/sea water treatment plant
- Point of contact
-
- Dalton Appleby dappleby@carrollton-ga.gov (770) 830-2000
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Carrollton, Georgia is soliciting proposals for SCADA and filter control system improvements at its Water Treatment Plant, with a pre-bid conference on November 17, 2026 and sealed proposals due December 3, 2026 at 2:00 p.m. The solicitation identifies no set-asides.
The scope replaces the plant's DeviceNet-based valve control system, which operates 61 valves across ten conventional filters, with conventional discrete and analog wiring. Each filter receives a dedicated Allen-Bradley PLC and touchscreen capable of standalone control without the supervisory ControlLogix PLCs. The integrator also replaces the existing SCADA system with new HMI software and computer hardware. Proposals must include all equipment, materials, labor, installation, applicable taxes, fees, and freight to Carrollton, Georgia.
The successful bidder must furnish a performance bond and a payment bond, each at 100 percent of the bid. The City reserves the right to reject any contractor without previous experience with projects of similar nature and complexity. Proposals are submitted in triplicate in sealed envelopes to Carrollton City Hall, 315 Bradley Street, and must be obtained through Dalton Appleby at dappleby@carrollton-ga.gov or 770-830-2000 to be considered valid. The pre-bid conference is held at the Carrollton Water Plant, 1007 N Park Street.
Evaluation weights are: proposed pricing, 45 points; locality, service, and availability together with previous experience with specified equipment and warranty, 25 points; qualifications, experience, and stability of the project team, 10 points; technical merits of the proposal, 10 points; and delivery and installation schedule, 10 points.
Opportunity text
This request is for a proposal to furnish all equipment, materials, and installation services to perform all services necessary for control and monitoring system improvements complete with all appurtenances and accessories to be installed at the City of Carrollton Water Treatment Plant. Currently the City¿s Water Plant operates ten conventional filters. Each filter has six individual valves; left influent, right influent, effluent, drain, wash and rewash, and a shared backwash valve for a total of 61 valves. These valves are controlled using a DeviceNet communication network and two Allen-Bradley ControlLogix PLCs with Panelview touchscreens. DeviceNet is no longer a widely used communication network and has proven more and more difficult for the city to support and maintain throughout the years. The purpose of this project is to abandon the existing DeviceNet based valve control system in lieu of simpler valve controls utilizing conventional discrete and analog wiring. Furthermore, it is the design intent that each filter will be capable of standalone control without the need of the Supervisory ControlLogix PLCs. Each filter will have its own dedicated Allen-Bradley PLC and touchscreen. Additionally, the integrator will replace the plant¿s existing SCADA system with new HMI software and computer hardware. Proposals shall include all materials, labor, applicable taxes and fees including freight to Carrollton, Georgia.
Files
| File | Type | Posted |
|---|---|---|
| Bid Advertisement _ WTP SCADA and Filter Cont.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity