About this opportunity
The Township of Hopewell, Mercer County, New Jersey is requesting sealed electronic bids for stormwater management improvements at the Wood Recycling Center under Bid #26-11, with bids due August 27, 2026 at 12:00 noon via BidNet Direct and questions due August 17, 2026 at 10:00 a.m. The project is subject to New Jersey prevailing wage requirements.
The scope encompasses site mobilization and clearing; excavation of 1,504 cubic yards; installation of 860 square yards each of bioretention soil mixture (24 inches thick), basin sand layer C-33 (6 inches thick), and coarse aggregate size No. 4 (10 inches thick); 600 cubic yards of type ML/CL core and cutoff; 2,350 square yards of geotextile filter fabric; two outlet structures; 80 linear feet of RCP Class III pipe in various sizes; two RCP Class III flared end sections; 183 cubic yards of rip-rap; 274 linear feet of 4-inch perforated PVC Schedule 40 underdrain; four 4-inch PVC Schedule 40 cleanouts; 30 cubic yards of clean crushed stone foundation material; 100 cubic yards of type ML/CL pipe backfill; two monitoring signs and posts; site restoration; and appurtenant items. Work must commence within ten calendar days of receiving the Notice to Proceed.
Bidders must submit a bid guarantee of ten percent of the total bid amount not to exceed twenty thousand dollars, in the form of a certified check, cashier's check, or bid bond. The successful bidder shall execute a Performance Bond and Labor and Material Payment Bond equal to 100 percent of the contract price and provide a Maintenance Bond of ten percent of the final contract amount for a one-year warranty period. Comprehensive general liability insurance must be carried with limits of one million dollars per person and three million dollars aggregate; automobile liability insurance of one million dollars per person; and excess/umbrella liability coverage of five million dollars. Additional compliance requirements include Public Works Contractor Registration Certificates, Business Registration Certificates, Federal Debarment Certification, Non-Collusion Affidavits, and affirmative action regulations under N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. All bids remain firm for sixty days following bid opening. Bid results will be posted on the Township website within twenty-four hours of bid opening.
Opportunity text
Scope of work: work on this project generally includes mobilization, site clearing, 1504 cy excavation (export), 860 sy bioretention soil mixture 24 thick, 860 sy basin sand layer c-33 6 thick, 860 sy coarse aggregate size no. 4 10 thick, 600 cy type ml/cl core and cutoff, 2350 sy geotextile filter fabric, 2 units outlet structures, 80 lf rcp class iii various sizes, 2 units rcp class iii flared end sections various sizes, 183 cy rip-rap, 274 lf 4 perf. pvc (sch 40) underdrain, 4 units 4 pvc (sch 40) cleanouts, 30 cy clean crushed stone foundation material, 100 cy type ml/cl pipe backfill, 2 units monitoring sign and post, site restoration and other appurtenant items. The contractor shall furnish all necessary labor, equipment, tools, implements and materials required to complete the improvements as shown on the construction plans within the time period specified. The work shall include but not be limited to mobilization, site clearing, excavation, grading, storm sewer installation, bioretention basin construction, soil erosion and sediment control measures, site restoration and all other incidentals appurtenant thereto as directed by the Engineer, in a neat, competent, and skilled manner. The contractor shall be able to perform all work in accordance with the project specifications and under the immediate supervision of the Engineer and shall be prepared to furnish the necessary labor required for the restoration of inaccessible areas. If sufficient materials, labor or equipment are not at the project site to complete this project or portion thereof when construction is in progress, the Engineer may summarily stop construction activity until such time as all necessary materials, labor, and equipment are at the project site.
Files
| File | Type | Posted |
|---|---|---|
| hopewell 26-11 Wood Recycling Center.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity