Wilson and Oak Knoll Substation Oil Containment

Closed State & local contract opportunity

Solicitation number
2023-IFB-LM-824
State
California
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Pasadena Water and Power Department is seeking a qualified contractor to construct oil containment systems at the Wilson and Oak Knoll Substations to comply with federal Environmental Protection Agency regulations under Title 40 CFR Part 112. The project requires comprehensive infrastructure modifications including sawcutting and removing existing concrete pads, excavation, backfilling, soil compaction, and installing reinforced concrete pipes, trenches, and structures to prevent potential oil spills from transformers and electrical equipment. Bidders must possess a Class A (General Engineering) or Class B (General Building) contractor license and be registered with the California Department of Industrial Relations. The mandatory pre-bid meeting is scheduled for October 23, 2023, at the Wilson Substation, with electronic bid submissions due by 11:00 am on Wednesday, November 22, 2023, through the City's eProcurement Portal. Contractors must submit various required forms, including a 5% bid security, performance and labor & materials bonds of 50%, equal employment opportunity documentation, non-collusion declarations, and a relevant experience form demonstrating five previous similar projects.

The contract does not explicitly outline specific set-aside designations for disadvantaged enterprises, though the required forms indicate an emphasis on equal employment opportunity and workforce diversity. The project is divided into two distinct groups: Wilson Substation (Project #1) and Oak Knoll Substation (Project #2), with specific line items for soil and concrete removal, conduit installation, and concrete vault construction. The contract duration is two years from the date of execution, with no optional extension periods. While no specific engineer's estimate was made available, the project involves comprehensive infrastructure modifications at two electrical substations located at 920 N. Wilson Avenue and 525 S. Oak Knoll Avenue in Pasadena. The work is funded by the City of Pasadena and aims to bring the substations into compliance with current environmental protection standards by implementing robust oil containment infrastructure to prevent potential environmental contamination from electrical equipment oil spills.

Opportunity text

The projects provide for the construction of an oil containment system in the Pasadena Wilson and Oak Knoll Substations that will prevent any mineral oil spills from transformers and electrical equipment from affecting the environment. Federal Environmental Protection Agency regulations require that potentially large oil spills be contained within the immediate area. The substations were constructed prior to these federal regulations. The projects will bring the substations up to code to comply with Title 40 (Protection of Environment), Code of Federal Regulations (CFR), Part 112 (Oil Pollution Prevention).

The construction work includes sawcutting and removal of existing concrete pad; excavation, backfill, soil compaction, testing and shoring where required; installation of reinforced concrete pipe, reinforced concrete trench with grates, and reinforced concrete structures; hauling, providing safety devices, demolition, etc.; and cleanup and miscellaneous appurtenant work.

Engineer's estimate will not be made available for these projects.

Files

Show all 17

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors