Wilson and Oak Knoll Substation Oil Containment
Solicitation number
2023-IFB-LM-824
Issued by
Los Angeles County, California

About this file

This document is a Subcontractor Listing form related to the Wilson and Oak Knoll Substation Oil Containment project in Pasadena, California. The form provides space for contractors to list subcontractors and potential shoring design engineers involved in the project. The document requires detailed information including names, addresses, and descriptions of work for both subcontractors and engineers responsible for shoring design.

The project involves constructing oil containment systems at two electrical substations to comply with Federal Environmental Protection Agency regulations under Title 40 CFR Part 112. The work includes sawcutting and removing existing concrete, excavation, backfill, soil compaction, installing reinforced concrete structures, trenches, and pipes, and implementing safety devices to prevent potential oil spills from affecting the environment. The form is designed to ensure transparency and accountability by requiring contractors to disclose all subcontractors and specialized engineering resources involved in the project's implementation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Subcontractor Listing/Shoring Design

SUBCONTRACTOR LISTING

Names (s) Address Description of Work

SHORING DESIGN

If shoring is required as part of this project, then the Civil or Structural Engineer who design this shoring is to be listed below, even if said Engineer is employed by the Contractor. If no shoring is required, write “NONE”.

Engineer Names (s) Address Description of Work

Names s 1:
Names s 2:
Names s 3:
Names s 4:
Names s 5:
Names s 6:
Names s 7:
Address 1:
Address 2:
Address 3:
Address 4:
Address 5:
Address 6:
Address 7:
Description of Work 1:
Description of Work 2:
Description of Work 3:
Description of Work 4:
Description of Work 5:
Description of Work 6:
Description of Work 7:
Engineer Names s 1:
Engineer Names s 2:
Engineer Names s 3:
Engineer Names s 4:
Engineer Names s 5:
Engineer Names s 6:
Address 1_2:
Address 2_2:
Address 3_2:
Address 4_2:
Address 5_2:
Address 6_2:
Description of Work 1_2:
Description of Work 2_2:
Description of Work 3_2:
Description of Work 4_2:
Description of Work 5_2:
Description of Work 6_2:

File details come from the government source that posted it. Updated .