Wetwell Level Monitoring Upgrade at Collections Pump Stations
Closed State & local contract opportunity Posted
- Solicitation number
- FE23-03
- State
- California
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Diane Marzano construction@ocsan.gov (714) 962-2411
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Orange County Sanitation District is soliciting work on a wetwell level monitoring upgrade at five collection pump stations across Orange County, California, with proposals due September 1, 2026.
The scope spans two distinct work streams across five locations. At Crystal Cove, MacArthur, Main Street, and Slater pump stations, the contractor will install new level transmitters and modify existing pump station control systems to enable Operations and Maintenance staff to locally select which level measurement device controls pump operation. At Edinger Pump Station, the contractor will replace the existing bubbler system with a new bubbler panel featuring redundant instruments and an automatic blowdown feature. The project addresses aging monitoring equipment and seeks to enhance system reliability, redundancy, and operational flexibility across dispersed wastewater collection infrastructure while maintaining service continuity.
Work locations are Crystal Cove Pump Station (6925 E Coast Hwy, Newport Beach, CA 92657), MacArthur Pump Station (4219 MacArthur Blvd, Newport Beach, CA 92660), Main Street Pump Station (1499 Main St, Irvine, CA 92714), Slater Pump Station (7202 Slater Ave., Huntington Beach, CA 92647), and Edinger Pump Station (5507 Edinger Ave, Huntington Beach, CA 92649). The contractor must coordinate installations across multiple geographically dispersed active wastewater collection facilities.
Opportunity text
The Work at four (4) Pump Stations: Crystal Cove, MacArthur, Main Street, and Slater involves installing new level transmitters at the pump stations and modifying the existing pump station control systems to allow Operations and Maintenance staff to locally select which level measurement device will control the pumps. The Work at Edinger Pump Station involves replacing the existing bubbler system with a new bubbler panel that includes redundant instruments and an automatic blowdown feature. The Project is located at five (5) Pump Stations listed: Crystal Cove Pump Station, 6925 E Coast Hwy, Newport Beach, CA 92657 (between Los Transcos and Crystal Heights Dr.), MacArthur Pump Station, 4219 MacArthur Blvd, Newport Beach, CA 92660 (MacArthur Blvd. & Von Karman Ave.), Main Street Pump Station, 1499 Main St, Irvine, CA 92714 (Main St. & Red Hill Ave.), Slater Pump Station, 7202 Slater Ave., Huntington Beach, CA 92647 (Slater Ave. & Gothard St.), and Edinger Pump Station, 5507 Edinger Ave, Huntington Beach, CA 92649 (Edinger Ave. & Graham St.)
Files
| File | Type | Posted |
|---|---|---|
| Wetwell Level Monitoring Upgrade at Collections Pump Stations.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity