Well Construction for Cypresswood & Pollard Road Water Treatment Facilities
Closed State & local contract opportunity Posted
- Solicitation number
- ITB-09084
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- 96261 Petroleum Production, Transmission, And Distribution Services For Oil And Gas Wells (Including Drilling, Exploration, Extraction, Project Management, Etc.)
- 91227 Construction, Irrigation System
- 96296 Well Services (Including Oil, Gas, And Water): Drilling, Plugging, Consulting, Maintenance, Repair, Etc.
- 92597 Water Supply, Treatment, And Distribution/Engineering
- 92537 Facilities Design Services, Engineering
Opportunity details come from vendor.myfloridamarketplace.com. Updated .
About this opportunity
The City of Winter Haven, Florida has issued an Invitation to Bid (ITB) for the construction and testing of production and monitoring wells at the Cypresswood Water Treatment Plant (WTP) and the Pollard Road WTP. The project consists of up to five production wells and one surficial aquifer monitoring well at each site, with options for lower Floridan aquifer (LFA) and upper Floridan aquifer (UFA) well completions. Bidders must submit proposals by July 9, 2024, with a public bid opening immediately following. Bidders may schedule site visits by contacting the City's project manager. The City reserves the right to reject any and all bids and will award the contract deemed to be in its best interest. The ITB includes detailed technical specifications and drawings for the well construction and testing requirements, and pricing is requested on a unit price basis, with a total bid amount including a contingency allowance. The successful bidder will be required to obtain all necessary permits and commence work within 20 days of the notice to proceed, with final completion within 150 calendar days.
The ITB does not mention any set-aside designations or restrictions on the types of organizations that can respond. The current incumbent vendors or contractors are not specified, and the existing infrastructure or technology that requires integration is not disclosed. The available budget or award value range is also not provided in the ITB documents.
Opportunity text
The project consists of the construction and testing of production and monitoring wells for two (2) planned water treatment facilities. The well drilling plan consists of:
Cypresswood WTF
- One (1) new surficial aquifer monitoring well
- Two (2) UFA production wells, with LFA finishing of the wells as add alternate
- Additional production well as an add alternate
Pollard Road WTF
- One (1) new surficial aquifer monitoring well
- Three (3) UFA production wells, with LFA finishing of the wells as add alternate
- Additional production well as an add alternate
Files
| File | Type | Posted |
|---|---|---|
| ITB-24-28 Well Construction Project.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity