Wyoming School District #7 (WCSD#7) is requesting design services for replacing the heat plant system at Upton High School, with proposals due November 19, 2026. The scope encompasses design, construction and bid documents, and construction observation services for a heating water system replacement.

The existing system consists of two Kewanee boilers and distribution pumps housed in the mechanical room on the first floor. The new design must integrate into the existing heating piping infrastructure, incorporate new piping, integrate with the existing control system, provide boiler redundancy, install a new expansion tank, address flushing and replacement of glycol, and meet the building's heating requirements. The design process may identify additive bid items during development. No single-source equipment specification or restrictive qualification requirement is stated in the available documentation.

The bid notice does not specify estimated contract value, contract term, incumbent information, evaluation criteria, a pre-bid meeting date, or a questions-due deadline. Interested parties should obtain the complete bid package and any addenda for pricing terms, funding authorization, submission instructions, and other contractual details.

Opportunity text

Project Description: Provide design, construction and bid documents, and construction observation services required for replacing the heat plant system. The existing heating water system consists of two (2) Kewanee boilers and system distribution pumps. The equipment is in the mechanical room on the first floor of the school building. The new system needs to be integrated into the existing heating system piping system, new pipes are expected, integration with the existing control system, redundancy of boilers, new expansion tank, expected flushing and replacement of glycol, and supply the heating requirements for the building. Identification of additive bid items could be determined during the design process.