Water, Wastewater, Stormwater, Paving, and Transportation Infrastructure Needs Assessment For the MLK Jr Station Area
Closed State & local contract opportunity Posted
- Solicitation number
- CIZ-DWU-26-457E
- State
- Texas
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90664 Planning, Urban (Community, Regional, Area Wide, And State)
- 91892 Urban Planning Consulting
- 92517 Civil Engineering
- 92528 Drainage Engineering
- 92549 Highways; Streets; Airport Pay-Parking Lots - Engineering
- 92558 Irrigation; Drainage; Flood Control/Engineering
- 92561 Land Development And Planning/Engineering
- 92587 Sewage Collection, Treatment, And Disposal/Engineering
- 92593 Traffic And Transportation Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 70171803 Flood protection or control services
- 81101500 Civil engineering
- 81101523 Urban design and engineering service
- 81102202 Urban transport network
- 81102203 Inland waterways
- 81101501 Well engineering
- 81101510 Highway engineering
- 70171800 Drainage services
- 81101525 Sediment control engineering
- 81102200 Transportation engineering
Opportunity details come from dallascityhall.bonfirehub.com. Updated .
About this opportunity
The City of Dallas, Texas is soliciting proposals for engineering and planning services to assess water, wastewater, stormwater, paving, and transportation infrastructure needs in the MLK Jr Station Development Area, with proposals due October 30, 2026.
The scope encompasses a needs assessment evaluating existing and future infrastructure requirements across multiple utility and transportation systems to support planned development and land-use decisions for the station area. The engagement requires engineering and planning professional services; Guadalupe Bailey, P.E., is the project manager.
The procurement covers multiple Dallas jurisdictional areas within Dallas County.
Opportunity text
Provide necessary Engineering and Planning Services required for evaluating water, wastewater, stormwater, paving, and transportation infrastructure needs for future development and land use of the MLK Jr Station Development Area. Project Manager Guadalupe Bailey, P.E.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity