Water Treatment Plant & Water System Improvements

Open State & local contract opportunity Posted

Solicitation number
10416352
State
Illinois
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Village of Greenup, Illinois is soliciting bids for a new 300 gallon-per-minute water treatment plant and the Route 130 Water Main Extension, with a pre-bid conference on November 3, 2026 at 10:00 a.m. CST and bids due December 2, 2026 at 10:00 a.m. CST. The project is posted in Dekalb County, Illinois (FIPS 17037).

Division A covers the treatment plant, including filtration systems, chemical feed systems, pumps, controls, site piping, and building, plus electrical system upgrades and a generator at the well field. Division B covers furnishing and installing 6-inch PVC RJ Yelomine HDD and 6-inch PVC SDR-21 water main along the design route, with water piping, fittings, valves, hydrants, services, connections, disconnections, appurtenances, and surface restoration. Per the bid documents, the work includes all labor, supervision, materials, supplies, transportation, equipment, and services necessary to complete the project as specified in the contract documents.

Farnsworth Group, Inc. provided engineering services for the project. Bidding documents are available through Quest CDN (Project Number 10416352) at http://bidlist.f-w.com/ for a $22.00 download fee; the package is 83 MB. Bids go to the Village Clerk at Greenup Village Hall, 115 E. Cumberland Street, Greenup, Illinois 62428, where they will be publicly opened and read. The pre-bid conference is held at the Village of Greenup Municipal Building at the same address. Project contact is Barbara Healy at Farnsworth Group, Inc., 400 W Jefferson, Suite A, Effingham, Illinois 62401, 217-531-1253, bhealy@F-W.com.

Opportunity text

Division A: Water Treatment Plant The work consists of a new 300 gallon per minute treatment plant with filtration systems, chemical feed systems, pumps, controls, site piping, and building. Work will also include upgrades to the electrical systems and the addition of a generator at the well field. The work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. Division B: Route 130 Water Main Extension The work consists of furnishing and installing water piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist of 6 PVC RJ Yelomine HDD and 6 PVC SDR-21 Water Main along design route. This work also includes surface restoration.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors