Water Treatment Plant Planning & Design
Closed State & local contract opportunity Posted
- Solicitation number
- 25-12
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 77000000 Environmental Services
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 76100000 Decontamination services
- 76130000 Toxic and hazardous waste cleanup
- 81103300 Geomatics engineering
- 77110000 Environmental protection
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- Point of contact
-
- Jackie Johnson jjohnson@gunnisonco.gov (970) 641-8172
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The City of Gunnison, Colorado, located in Grand County, is seeking a qualified design-build team for a Progressive Design-Build (PDB) Water Treatment Plant project through a Request for Qualifications (RFQ) released on July 21, 2025. The procurement aims to develop a new water treatment facility with a target capacity of 4 MGD firm and 5 MGD total, with potential future expansion to 6 MGD. Respondents must demonstrate extensive experience in membrane technology treatment, water source transitions, and complex facility construction in challenging environments, submitting a minimum of three and up to seven reference projects. The RFQ requires detailed submissions including team structure, key personnel resumes, and prequalification documentation, with an evaluation process that includes a pass/fail qualification checklist and weighted scoring across categories such as team structure, key personnel experience, project experience, and project approach. Proposals are due on August 28, 2025, by 2:00 PM Mountain Time, with the city anticipating short-listing up to three respondents and issuing a Request for Proposals (RFP) in September 2025, and a potential Phase 1 Notice to Proceed in January 2026.
The project is anticipated to be funded through a combination of federal, state, and local funds, including grants from the Colorado Department of Local Affairs and the U.S. Department of the Interior, with an estimated total project cost of approximately $40 million and approximately $3.6 million already secured for the design phase. Financial requirements for respondents include submitting reviewed or audited financial statements, demonstrating current bonding capacity, and providing insurance confirmations. The contract will be implemented as either a Guaranteed Maximum Price (GMP) or Lump Sum (LS) contract, with the Design-Builder expected to construct the facility as designed, within the agreed-upon price and schedule, and complete commissioning and startup. While no specific set-aside designations or disadvantaged enterprise requirements are explicitly mentioned, the procurement emphasizes collaboration and flexibility, with the City committed to working closely with the selected Design-Builder to achieve project goals that include providing a reliable and efficient water delivery system, protecting water resources, minimizing environmental impacts, and ensuring sustainability.
Opportunity text
By implementing the PDB delivery method for this Project, the City is committed to working in close collaboration with the selected Design-Builder during Phase 1 to develop a design and funding for construction that achieves the City objectives at a mutually agreeable Contract Price, implemented as a GMP or LS for delivery of the Project. The City also expects the Design-Builder to construct the Project, as designed, within the agreed-upon price and schedule, through commissioning, startup, and Acceptance. Prior to determining that PDB would be the preferred delivery method to meet the City's Water System Improvement Community Objectives, the City created a program for the Project through a public process that established a broad overall set of objectives for the Project, regardless of the ultimate delivery method.
Files
| File | Type | Posted |
|---|---|---|
| 01 WTP - RFQ 25-12.pdf | ||
| 02 WTP - RFQ 25-12 - Fillable document.docx | DOCX document | |
| 03 RFQ 25-12 Background Documents.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity