About this opportunity
The City of Newman, Illinois is soliciting sealed bids on Water System Improvements 2026, comprising two divisions with bids due October 23, 2026 at 10:00 a.m. CDT at City Hall. Contractors must submit bids on both Division A and Division B to be considered for award; the project will be awarded to the lowest combined bid.
Division A covers furnishing and installation of approximately 1,500 linear feet of 4-inch PVC SDR 21 water main, including piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. The scope includes surface restoration with various pavements, curbing, and sidewalks. Division B covers furnishing and installation of controls and communication systems within the existing Water Treatment Plant, including a new control panel, upgrades to cellular communication for remote monitoring and support, a new programmable logic controller (PLC), pressure monitoring controls, an HMI screen, a new supervisory control and data acquisition (SCADA) system, and replacement of variable frequency drives (VFDs) at existing pumps.
All labor, supervision, materials, supplies, transportation, equipment, and services necessary to complete the work are the contractor's responsibility. A non-mandatory pre-bid meeting is scheduled for October 14, 2026 at 10:00 a.m. local time. Bid documents are available through QuestCDN for $22.00. The project contact is Roger Nuxoll at Farnsworth Group, Inc., 400 W Jefferson Avenue, Suite A, Effingham, Illinois 62401; telephone 217-531-1253; email rnuxoll@f-w.com.
Opportunity text
Division A Water Main Replacement The work generally consists of furnishing and installation of water system piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable water. Installation will consist approximately 1,500 LF of 4 PVC SDR 21 water main along the design route as shown on the plans. This work also includes surface restoration with various pavements, curbing, and sidewalks. This work shall include all labor, supervision, materials, supplies, transportation, equipment, and services necessary and required to perform the project as set forth in the Contract Documents. Division B WTP Controls and SCADA Replacement The work generally consists of furnishing and installation of controls and communication system within the existing Water Treatment Plant. The city would like to update the entire control panel. Upgrades would also include upgrading to cellular communication for easier monitoring, maintenance, troubleshooting, and to have remote support. The new system would also include a new programmable Logic Controller (PLC) and pressure monitoring controls. An HMI screen, a new Supervisory Control and Data Acquisition (SCADA), and replacing the VFDS at the existing pumps are also all parts of the new control upgrades.
Files
| File | Type | Posted |
|---|---|---|
| Farnsworth Group INC - Projects city of newman water system improvements.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity