Wastewater Treatment Plant Repairs at Cooper Lake State Park - South Sulphur Unit
Closed State & local contract opportunity Posted
- Solicitation number
- 1210204
- State
- Texas
- Responses due
Opportunity facts
- NIGP codes
- UNSPSC codes
- 72101515 Subsidence service work
- 72141130 Ornamental fountain construction and or remodelling service
- 72141511 Digging services
- 95121642 Sewage pumping station
- 72101512 Hoist construction service
- 72101513 Offsite construction service
- 72101514 Refuse area construction service
- 72141507 Pile driving service
- 72141508 Blasting service except building demolition
- 72141510 Demolition services
Show all 11
- Point of contact
-
- Mindi Johnson mindi.johnson@tpwd.texas.gov (512) 389-8282
Opportunity details come from txsmartbuy.com. Updated .
About this opportunity
The state of Texas is seeking qualified contractors for wastewater treatment plant repairs at Cooper Lake State Park's South Sulphur Unit, with a solicitation issued on February 14, 2025, and proposals due by March 20, 2025. This procurement appears to be a targeted infrastructure maintenance project focusing on critical wastewater system upgrades and repairs within a state park facility. The project will require specialized contractors with expertise in municipal and park infrastructure maintenance, specifically in wastewater treatment system rehabilitation and repair. Potential bidders must demonstrate technical competence, relevant experience with similar state park infrastructure projects, and the capability to complete comprehensive repairs within the specified timeframe. While specific evaluation criteria are not fully detailed in the provided information, contractors can anticipate being assessed on technical qualifications, proposed methodology, cost-effectiveness, and demonstrated capacity to execute complex infrastructure repair work in a state park environment.
The contract opportunity does not explicitly indicate any specific set-aside designations or restrictions on vendor participation based on the available information. No incumbent vendors or current contractors are mentioned in the provided documentation. The scope suggests the project will require integration with existing wastewater treatment infrastructure at the South Sulphus Unit of Cooper Lake State Park. While precise budget ranges are not specified, infrastructure repair projects of this nature typically involve moderate to significant capital investment, potentially ranging from $100,000 to $500,000 depending on the extent of required repairs and system upgrades. Interested contractors should carefully review the full solicitation documentation to understand the complete technical specifications, site conditions, and precise repair requirements for the wastewater treatment plant at this state park location.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity