The City of Houston is soliciting bids for construction services to rehabilitate and reconstruct wastewater force main infrastructure at the Songwood and Gessner No. 1 Lift Station locations, with bids due August 20, 2026. No WBE/MBE goal applies to this solicitation.

Work includes installation and replacement of force main infrastructure within sanitary sewer easements and public rights-of-way to improve system reliability, capacity, and operational efficiency. All work must comply with applicable pipeline standards and Harris County Flood Control District (HCFCD) requirements. Bidders are required to complete mandatory site visits and background checks for contractor personnel prior to bid submission or contract award.

The estimated construction budget is $5 million. NIGP codes are 958-11, 968-95, 913-59, and 913-9M. Supporting documentation includes Phase 1 Environmental Site Assessment reports for both Songwood and Gessner locations, revised plans set drawings (R-000035-0028-4), geotechnical reports, a project manual, federal provisions exhibit, and site visit and background check requirements (Exhibit J). Additional project details and bid submission procedures are available through the City of Houston Strategic Procurement Division's Bid Opening portal and the BeaconBid platform.

Opportunity text

Project Summary: The City of Houston ("City") is soliciting bids from qualified bidders to provide construction services for wastewater force main rehabilitation and reconstruction at the Songwood and Gessner lift station locations. Work includes the installation and replacement of force main infrastructure within sanitary sewer easements and public rights-of-way to improve system reliability, capacity, and operational efficiency. Contractor shall comply with all applicable pipeline and Harris County Flood Control District (HCFCD) requirements.Estimated Construction Budget: $5,000,000.00 NIGP Code: 958-11, 968-95, 913-59, 913-9M/WBE Goal: 0%For information related to bid opening, please visit the following link: Strategic Procurement Division's Bid Opening