Gessner Geotech - WW FM Replacement R-000035-0028.pdf

PDF 1 KB Posted

Attached to
Wastewater Force Main Rehabilitation and Reconstruction – Songwood and Gessner No. 1 Lift Stations
Solicitation number
CB-2026-0056
Issued by
Texas

About this file

This is a bid document for a wastewater force main rehabilitation and reconstruction project issued by the City of Houston, Texas. The project encompasses the installation and replacement of force main infrastructure at the Songwood and Gessner No. 1 Lift Stations, with work to be performed within sanitary sewer easements and public rights-of-way. The scope of work is designed to improve system reliability, capacity, and operational efficiency while ensuring compliance with all applicable pipeline standards and Harris County Flood Control District (HCFCD) requirements. The estimated construction budget for this project is $5,000,000.00, with project oversight and bid management handled through the City's Strategic Procurement Division.

The project carries no WBE (Women's Business Enterprise) goal requirement and is classified under NIGP codes 958-11, 968-95, 913-59, and 913-9M. Qualified bidders are required to submit bids through the designated bid opening process managed by the City of Houston's Strategic Procurement Division. The document indicates that additional project details, specifications, and technical requirements are accessible through the Beacon Bid platform, which serves as the repository for all supplementary documentation related to this solicitation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

You need to enable JavaScript to access www.beaconbid.com

File details come from the government source that posted it. Updated .