- The City of San Angelo is seeking qualified engineering firms through a Request for Qualifications (RFQ) for a specialized Water Treatment Plant Control Evaluation Project focusing on Manganese (Mn), Natural Organic Matter (NOM), and Disinfection Byproducts (DBP). The project will be conducted at the San Angelo Surface Water Treatment Plant, which has a 42 million gallons per day capacity and draws water from the South Concho River and O.H. Ivie Reservoir. Specific deliverables include examining...
- Williamson County is soliciting qualifications from engineering firms to develop a comprehensive regional water plan through Request for Qualifications (RFQ) 26RFSQ13. The project requires engineering services focused on water resources planning, which includes project management, demand outlook analysis, supply outlook evaluation, water supply and demand assessment, water treatment assessment, and water transmission assessment. The County anticipates selecting one or more firms to produce an...
- The Santa Clara Valley Water District (Valley Water) is seeking environmental and engineering consulting services to conduct the 2026 Local Watershed Sanitary Survey covering four drinking water reservoirs: Anderson, Coyote, Calero, and Almaden. The survey will comprehensively evaluate watershed status, water quality, potential contaminant sources, invasive species risks, and drought impacts for the five-year period from January 1, 2021, through December 31, 2025. Proposers must have at least 10...
- The City of Phoenix is seeking a qualified consultant team to provide engineering services for the Union Hills Water Treatment Plant Finished Water Improvements project. The scope includes conducting a study, designing, and potentially providing construction administration and inspection services for constructing a new 20 million gallon concrete reservoir and rehabilitating an existing 40 million gallon reservoir, along with associated site improvements such as utility design, grading, and...
The City of Waco, Texas, has issued a Request for Qualifications (RFQ) 2026-001 seeking a professional engineering consulting firm to conduct a comprehensive biological and chemical study of Lake Waco. The primary objective is to analyze the lake's current condition and develop recommendations for improving the city's water treatment process. Qualified firms must demonstrate multidisciplinary team capabilities, including a Texas-licensed Professional Engineer experienced in drinking water treatment, aquatic scientists or limnologists with reservoir dynamics expertise, and qualified field and laboratory personnel. The study will encompass six base tasks: reviewing existing information and regulatory records, developing a study plan, preparing a sampling and analysis plan, conducting field sampling and laboratory analysis, drafting a report, and resolving city review comments. An optional seventh task involves preparing a Preliminary Engineering Report, which may be added through a contract amendment. The procurement timeline includes a questions deadline of February 19, 2026, at 5:00 p.m. CT and a submission deadline of March 11, 2026, at 2:00 p.m. CT, with proposals to be opened via Zoom video conferencing at 2:01 p.m. The evaluation will be conducted by a Project Review Committee using a 100-point system, with 50 points for firm expertise and experience, 40 points for project approach, and 10 points for conformance with RFQ requirements. The RFQ does not specify any specific set-aside designations or restrictions for disadvantaged enterprises. Electronic submissions are preferred through the EUNA/Bonfire portal, with alternative options for paper submissions including one electronic copy and one original plus four physical copies. No pricing information should be included in the Statements of Qualifications, as the selection process follows Chapter 2254 of the Texas Government Code and will be based solely on qualifications and technical merit. The selected firm must complete all work within 18 months from the Notice to Proceed. After evaluation and potential oral interviews, the Director of Infrastructure Services will establish final firm rankings, with contract negotiations beginning with the top-ranked firm. Contract awards exceeding $100,000 will require City Council approval, while smaller contracts may be executed by the City Manager, Assistant City Manager, department head, or director. While specific budget ranges are not explicitly stated in the provided documentation, the comprehensive nature of the study and the requirement for a multidisciplinary team suggests a substantial professional services contract.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
1-RFQ 2026-001 Qualification Package.pdf | 25MB | 1/12/26 | ||
2-RFQ 2026-001 Zoom Information.pdf | 711KB | 1/12/26 |