The City of Phoenix is requesting bids on the FY 2026 Congestion Mitigation and Air Quality Improvement Alley Dustproofing project, covering approximately 35.8 miles of unstabilized alleys within Phoenix, with bids due September 9, 2026 at 2:00 p.m. and a pre-bid meeting on August 13, 2026 at 9:00 a.m. The project is federally funded through CMAQ sources; Davis-Bacon Act prevailing wage requirements do not apply.

Work scope comprises clearing, grubbing, and subgrade preparation followed by application of a 3/8" Fractured Aggregate Surface Treatment consisting of a single application of rubberized asphalt and precoated chips to existing dirt alleys. The project spans Phoenix City Council Districts 4, 7, and 8.

This is a federal-aid project subject to 49 Code of Federal Regulations Part 26 and the U.S. Department of Transportation DBE Program, with a Disadvantaged Business Enterprise goal of 0%. The City will ensure compliance with Title VI of the Civil Rights Act of 1964 and affirm that DBEs receive full and fair opportunity to bid without discrimination.

Award will be made to the lowest responsible responsive bidder. The City reserves the right to reject all bids. Bid packets are available for download beginning July 30, 2026 through the City's e-Procurement Portal. The pre-bid meeting will be held at 1034 E. Madison Street, Phoenix, with virtual attendance available via Microsoft Teams. Bids will be opened the same day at Phoenix City Hall, 200 W. Washington Street, 5th Floor, Room 5 West. The project is identified under OpenGov ID No. ST87440029 and ADOT TRACS No. T0693 01C.

Opportunity text

The FY26 Congestion Mitigation and Air Quality Improvement Alley Dustproofing project will include approximately 35.8 miles of unstabilized alleys within the City of Phoenix using a 3/8" Fractured Aggregate Surface Treatment which provides a single application of rubberized asphalt and precoated chips to the existing dirt alleys. Clearing, grubbing, and subgrade preparation will be required for application of the material. This is a federal-aid project, however the prevailing basic hourly wage rates and fringe benefit payments, as determined by the Secretary of Labor pursuant to the provisions of the Davis-Bacon Act, are not applicable.