The Village of Pleasant Prairie, Wisconsin is requesting sealed bids for local street construction and utility installation on 93rd Street between 63rd Avenue and Cooper Road, with bids due November 10, 2026.
The scope spans excavation, base and granular fill, culvert pipes, storm and sanitary sewer systems, water main installation, concrete and HMA pavement, concrete curb and gutter, sidewalk, lighting, landscaping, erosion control, permanent signing, and pavement marking. Work is divided into three stages: Stage 1 (sanitary sewer, water main, and storm sewer with concrete pavement from Station 50+54 to 83+25) with environmental restrictions on fish spawning disturbances between March 1 and June 15 and tree clearing between April 15 and October 31 to protect endangered bat species; Stage 2 (remaining storm sewer and roadway work from Station 83+25 to 93+30.27), not to begin before July 26, 2027; and Stage 3 (HMA paving and pavement markings).
Contractors must submit proposals electronically via Bid Express or request a waiver for paper submission. A proposal guaranty bond payable to the State of Wisconsin and a signed list of proposed subcontractors with estimated values for each work class are required at least 48 hours before bid closing. Bidders must certify non-debarment from federal contracts and comply with non-discrimination and equal-employment provisions. An Erosion Control Implementation Plan must be submitted at least 14 days before the preconstruction conference.
The contract is subject to Wisconsin Department of Natural Resources permits, including Section 404 transportation general permits and WPDES Transportation Construction General Permit coverage for approximately 9.14 acres of construction activity. Work must comply with the 2025 Edition of the Standard Specifications for Highway and Structure Construction and Village of Pleasant Prairie design standards. No construction is permitted between 10:00 PM and 7:00 AM without prior written approval. Coordination is required with multiple utility providers (WE Energies, AT&T Wisconsin, Spectrum, TDS Telecom), Kenosha Unified School District, USPS, and local services during the project.
Opportunity text
The work under this contract consists of excavation common, base aggregate, granular backfill, culvert pipes, storm sewer, water main, sanitary sewer, concrete pavement, HMA pavement, concrete curb and gutter, sidewalk, lighting, landscaping, erosion control, permanent signing, pavement marking and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.