V Lisbon, Redford Blvd Intersection with Lisbon Rd CTH F
Open State & local contract opportunity Posted
- Solicitation number
- 20261208020
- State
- Wisconsin
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Wisconsin Department of Transportation is soliciting bids for the V Lisbon reconstruction of the Redford Boulevard and Lisbon Road intersection in Lisbon, Waukesha County, under Proposal 2450-06-71, with bids due December 8, 2026. Bids are due electronically or on paper with waiver before 11:45 a.m. on the last business day preceding the letting. The source names no set-aside or preference program.
The scope covers common excavation, base aggregate, concrete and HMA pavement, concrete curb and gutter, storm sewer, culvert pipes, traffic signals, signing, pavement marking, and traffic control. The project runs in five construction stages with interim completion milestones. Traffic signal equipment must conform to NEMA TS2 Type 2 standards, and Waukesha County will provide final acceptance of traffic signal cabinet and controller installations. The contractor must submit an Erosion Control Implementation Plan 14 days before the preconstruction meeting and obtain coverage under the Wisconsin Pollutant Discharge Elimination System Transportation Construction General Permit for 2.52 acres of land disturbance. Relocations by We Energies, AT&T, Spectrum, American Transmission Company, and Bluebird Communications must be coordinated before construction. Traffic must be maintained on CTH F and CTH K with no flagging, and holiday and special event restrictions apply.
Contract economics include a proposal guaranty bond, with a performance bond and contract execution due within 14 days of award notification. Work must begin within 10 calendar days after written notice from the engineer. Lane rental charges run $2,000 per lane per direction of travel per hour, in 15-minute increments, for closures outside allowable times. Interim liquidated damages of $2,000 per calendar day apply if Stage 2 or Stage 4 pavement replacement, each limited to 10 calendar days, is not completed on schedule. All bidders must comply with Wisconsin non-discrimination employment requirements.
Opportunity text
The work under this contract consists of common excavation, base aggregate, concrete pavement, HMA pavement, concrete curb & gutter, storm sewer, culvert pipes, traffic signals, signing, pavement marking, traffic control and all incidental items necessary to complete the work as shown on the plans and included in the proposal and contract.