UW tower data center: upgrade/integrate branch circuit monitoring system
Closed State & local contract opportunity Posted
- Solicitation number
- 680545
- State
- Washington
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 28502 Analyzer, Electric Power Demand
- 28514 Circuit Breakers, Load Centers, Boxes, And Panelboards
- 69014 Analyzers And Accessories
- 69031 Controls, Integrated System
- 69032 Controls, Programmable
- 69039 Diodes, Coils, And Other Circuit Components
- 94139 Digital And Analog Testing Equipment Maintenance And Repair
Updated .
About this opportunity
The University of Washington ("Project Owner") is seeking proposals from experienced, licensed electrical or controls contractors to perform the upgrade and integration of a Branch Circuit Monitoring System (BCMS) for its data center located in King County, Washington. The scope of work includes procuring and installing a complete BCMS retrofit in 18 existing Remote Power Panels (RPPs), validating the functionality of the BCMS points and ethernet cabling, and providing as-built documentation. Proposals are due by August 15, 2024, and a mandatory pre-bid site walk-through will be held on August 1, 2024. The contract will be awarded based on the contractor's previous experience, qualifications of the assigned team, the proposed price, and history of meeting project schedules. The RFP outlines specific requirements for the BCMS system, including local display panels, system status monitoring, and connectivity to the campus Building Management System.
The RFP indicates that no preference will be given for Minority and Women Business Enterprise (MWBE) participation, and voluntary goals for U.S. Small Business participation are set at 15%. The RFP does not provide any information about pricing terms, set-asides, incumbents, funding requirements or sources, or other salient financial details.
Opportunity text
The University of Washington ("Project Owner"), who has operated its data center at this location continuously since 2009, is undertaking this project to better provide detailed monitoring of the power used by the IT equipment equipment/racks. The Scope of Work describes the work to be performed and outlines a comprehensive means of selecting an independent suitable contractor team to execute/complete/commission the work.
Files
| File | Type | Posted |
|---|---|---|
| Addendum1.docx | DOCX document | |
| UW TOWER DATA CENTER INTEGRATE BCMS.pdf | ||
| Addendum 1.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity