US 80 & US 167: Repairs

Open State & local contract opportunity Posted

Solicitation number
H.016797
State
Louisiana
Responses due

Opportunity facts

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Louisiana Department of Transportation and Development (LA DOTD) is soliciting electronic bids on US 80 and US 167 highway repairs, including asphalt milling, pavement patching, reinforced paving mat, and asphalt concrete overlay, with bids and bid bonds due through www.bidx.com before 10:00 a.m. on November 18, 2026. No set-aside or preference applies; the project is not designated a Small Business Element Goal Project. Contractors must hold a license under LA R.S. 37:2150-2165 for the Highway, Street, and Bridge Construction classification, and online bidder registration must be completed at least 24 hours before bid opening.

The work covers a 2.34-mile section in Lincoln Parish according to the attached proposal, while the notice lists Livingston Parish and New Orleans City as jurisdictions. Lane closures are restricted by project section, with no closures Monday through Friday from 7:00 a.m. to 7:00 p.m. in certain areas, and no work during designated holidays or weather events. Specialty items designated for potential subletting include reflectorized raised pavement markers and plastic pavement striping and legend work. Required insurance includes Workers Compensation, Commercial General Liability with combined single limits of $1 million to $5 million depending on contract amount, Owner's and Contractor's Protective Liability, and Business Automobile Liability, all with an A.M. Best rating of A-:VI or higher. Railroad Protective Liability is required for Kansas City Southern Railway Company, at a ratio of 1 percent of estimated work cost within the railway's property to total project cost.

The estimated cost range is $5 million to $7.5 million. The contract time is 75 working days, with a 90-calendar-day assembly period permitted before contract time is assessed. Payment adjustments apply to Performance Graded asphalt cements, gasoline, diesel fuel, and steel when costs vary more than 5 percent from base prices. The project engineer is Marshall Hill of Infrastructure Consulting & Engineering.

Opportunity text

Milling asphalt pavement, pavement patching, reinforced paving mat for asphalt concrete, asphalt concrete overlay, and related work.

Files

File Type Posted
ladot_h.016797_proposal.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors