US 11 over Burd Run Bridge Replacement

Closed State & local contract opportunity Posted

Solicitation number
117464
State
Pennsylvania
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Pennsylvania Department of Transportation is requesting bids for superstructure replacement of the bridge carrying State Route 0011 over Burd Run in Cumberland County, Shippensburg Township, with bids due September 17, 2026 at 11:00 a.m. Prequalification is required, and this project is federally funded under National Highway System oversight with DBE requirements and Buy America / Build America Act provisions in effect.

The scope consists of superstructure replacement of a single-span reinforced concrete T-beam bridge with a new five-beam composite pre-stressed box beam configuration on existing abutments, roadway reconstruction, milling and paving, and barrier replacement across 400 linear feet. Bid items include clearing and grubbing, class excavation (695 cubic yards), asphalt mixtures at various depths, bridge superstructure work, guide rail installation, traffic control, erosion and sediment pollution control measures, stream diversion, and health and safety plans. Pavement ride quality will be evaluated with incentive and disincentive payments. Concrete strength testing and material storage prepayment provisions are required.

The estimated project cost range is $1 million to $2.499 million. Work must be completed by October 14, 2027, with anticipated Notice to Proceed on November 2, 2026. Environmental constraints prohibit in-stream work between October 1 and April 1 to protect Class A brown trout. The project requires coordination with Shippensburg University regarding spring class schedules. Applicable permits include an E22-9999 Maintenance Permit, NPDES permit provisions, and U.S. Army Corps of Engineers PASPGP-6 permit compliance. The contract includes wage rate requirements and mandates Title VI non-discrimination assurances and compliance with FAR 52.240-1 restrictions on unmanned aircraft systems. Addenda are posted electronically through the project's electronic contract management system; no pre-bid meeting is scheduled.

Opportunity text

The project consists of the superstructure replacement of the bridge carrying SR 0011 over Burd Run. The existing structure is a single-span reinforced concrete T-beam bridge (RCT) founded on cast-in-place reinforced concrete abutments. The project includes replacement of the beams and deck with a new five beam composite pre-stressed box beam configuration on the existing abutments, roadway reconstruction & milling/paving, and barrier replacement, and other miscellaneous construction, all as indicated on the approved drawings included in the Bid Package for State Route 0011, Section 128, in Cumberland County, Shippensburg Township, from 0.20 mile north of the intersection with SR 0174 at Segment 0040 Offset 0477 to Segment 0040 Offset 1078, for an overall project length of 400.00 linear feet (0.076 mile).

Files

File Type Posted
839933padot117464.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity