UPCOMING . .. .. Alton Driver Relief Facility (rebid)
Open State & local contract opportunity Posted
- Solicitation number
- Advertising 26-1-24600R1
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from mct-act.bonfirehub.com. Updated .
About this opportunity
The Illinois Department of Transportation is providing advance public notice of a rebid opportunity for construction of an Alton Driver Relief Facility at 600 Piasa Street, Alton, Illinois, with an estimated IFB release in November 2026 and bids due December 4, 2026. This is a federally funded project that was previously cancelled.
The scope includes an 872-square-foot building addition to an existing 785-square-foot structure, housing a driver lounge, kitchenette, mechanical and storage room, and circulation space. The addition will match existing construction with concrete masonry unit walls, brick veneer, cast stone banding, sills and wall caps, glass block windows, and a slate roof over light-gauge metal trusses. Site improvements encompass new parking stalls along a brick retaining wall, modifications to existing concrete and brick patio, a new concrete ramp, and an outdoor mechanical enclosure for HVAC equipment. The scope also includes access control and video surveillance systems for the new addition and adjacent bus station structure, with modifications to existing mechanical space to accommodate these systems. Project location is Madison County, Illinois.
No contract value, contract term length, or detailed evaluation criteria are currently specified in this advance notice. Full IFB documents will be released in November 2026.
Opportunity text
This notice provides advance public notice of an upcoming bid opportunity. No documents are currently available. Rebid of prior cancelled project: This federally funded project is located at 600 Piasa St., Alton, IL 62002. Construction includes an 872- square-foot building addition featuring a driver lounge, kitchenette, mechanical/storage room, and circulation space. The addition will be connected to an existing 785-square-foot building containing two restrooms and a mechanical room and will be constructed to match the existing structure with block CMU walls, brick veneer, cast stone banding and sills, glass block windows, and cast stone wall caps, with a slate roof over light-gauge metal trusses. Site improvements will include new parking stalls along a brick retaining wall, modifications to the existing concrete and brick patio, and a new concrete ramp. The scope also includes new access control and video surveillance for the new addition and adjacent bus station structure, requiring modifications to the existing mechanical space, as well as the construction of an outdoor mechanical enclosure to house HVAC equipment. Estimated IFB release date for construction: November 2026
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity