Underground Electrical and Communications Installation

Open State & local contract opportunity Posted

Solicitation number
41059
State
Arizona
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

Maricopa County, Arizona has posted a solicitation for priced quotes on underground electrical and communications installation at a residential property, with responses due November 20, 2026. Pricing must include all equipment, materials, and labor, and the contractor must contact Arizona 811 before starting any work.

The scope covers underground utility trenching with conduit supply, connections, and backfill and compaction using excavated soil. Specified work includes a 2.5-inch DB-120 electrical conduit run of approximately 35 linear feet from the house service entrance to an existing APS wood power pole on the Varney Road frontage, a 3-foot by 3-foot by 3-foot conduit pit at the pole, and a rigid riser with a no-hub fitting at a specified Square D service entrance panel at the front of the garage. The scope also includes a 1-inch Schedule 40 communications conduit of approximately 35 feet in a joint trench with APS, maintaining 1 foot of backfill separation, ending in a 6-inch round junction box at grade. Habitat installs the SES panel under a separate scope.

The attached Scope of Work document (41059, 216KB) governs the detailed requirements. The posting was published November 11, 2026.

Opportunity text

The contractor must provide pricing for the installation of underground electrical, and communications as outlined in the project description of the scope of work. The price must include all equipment, materials, and labor. The Contractor will be responsible for contacting Arizona 811 prior to any work being started. The project scope includes providing a quote for underground utility trenching, covering all conduit supply, connections, and backfill/compaction using excavated soil.(Habitat will install an SES panel on the house.) The SES panel is a Square D SC3042M200SPHlocated at the front of the garage. The contractor will need to supply a 2 12-inch rigid riser with no hub at the panel. The trench will extend from the house SES panel to the existing APS wood power pole at the front of the lot (Varney Road frontage), with a 2.5-inch DB-120conduit spanning approximately35 linear feet. A 3 ft x 3 ft x 3 ft conduit pit will be excavated at the APS power pole. Additionally, include 1 ft. of backfill separation for installing a 1-inch Schedule 40 communication conduit sharing a joint trench with APS. The 1-inch communication line will run approximately 35 ft., with a stub-up from the new house SES to the easement at the front, ending at a 6-inch round junction box installed at grade

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors