The City of Corpus Christi, Texas is requesting bids on TSA Equipment Relocation Phase II improvements at Corpus Christi International Airport under RFB 6448, with bids due June 3, 2026.

The scope encompasses comprehensive renovations to Room 1034 and construction of exterior overhead canopies at Rooms 1034 and 1044 on the airside of the terminal. Work in Room 1034 includes relocation or disposal of existing TSA screening equipment; coordination with a city-procured contractor managing CT-80 machine relocation; dust control around scanning equipment during construction; floor repair in the ticketing lobby area where equipment is removed; removal, storage, or disposal of existing light fixtures; wall modifications to accommodate oversized baggage and TSA workspace; construction of one 6-foot exterior roll-up door opening in the terminal's exterior masonry wall; installation of doors and windstorm-compliant draft curtains for baggage handling equipment; installation of baggage conveyor equipment running from the interior ticketing area to the exterior; new electrical circuits for baggage equipment (either ceiling-dropped or extended from existing check-in counter service); LED lighting and switches; security improvements including access control card readers, cameras, and panic bar hardware; exterior wall insulation and gypsum board finishing (tape, float, texture, paint); acoustic drop ceiling; and new flooring with existing floor cleaning.

The RFB document establishes technical scope and bidding requirements. The source does not disclose estimated contract value, contract term, evaluation criteria weighting, pre-bid meeting or site-visit dates, question due date, incumbent contractor, or set-aside or preference program eligibility.

Opportunity text

1. Improvements to Room 1034 at Corpus Christi International Airport. a. Improvements include, but are not limited to, relocation or disposal of existing equipment and finishes; coordination with City Procured Contractor tasked with CT- 80 machine and appurtenances relocation to renovated Room 1034; Contractor to furnish and maintain appropriate and adequate dust control around scanning equipment during construction activities; floor repair where the existing TSA screening equipment is removed from ticketing lobby area; removal and storage or disposal of lights / diffusers as required for new fixtures; modifications to walls to accommodate for oversized baggage and TSA work space;Construction of one (1) opening in the exterior masonry wall of the terminal building for a 6-ft roll up door; Installation of appropriate doors and / or draft curtains for baggage handling equipment; Installation of baggage conveyor equipment from interior ticketing area to exterior of the terminal building for baggage and installation of appropriate doors and / or draft curtain, doors and draft curtain to be Windstorm Compliant; removal, salvage, and storage of existing rollup door on the exterior and fill in door space with masonry that matches existing exterior masonry wall; Installation of new electrical circuits for baggage equipment, to drop down from ceiling OR sawcut and extend service from existing check-in counter to new baggage equipment location; Furnish and install appropriate LED lighting and switches; Furnish and install security improvements, including but not limited to, access control card readers, cameras, panic bar hardware on doors as noted; Furnish and install exterior wall insulation and finish gypsum board, including tape/float/texture/paint; Furnish and install acoustic dropdown ceiling; Cleaning of existing floor and installation of new flooring. 2. Exterior Overhead Canopies for Rooms 1034 and 1044: a. Construct overheard canopies on the airside exterior of the Terminal Building. New canopies to include gutter system and lighting. Installation of oscillating fans under existing canopy structures. The Work includes Contractor providing a structure that is Windstorm Certification compliant as follows: 1) WINDSTORM CERTIFICATION: Project is in a designated catastrophe area and must obtain appropriate windstorm certification for Exterior Overhead Canopies and any other component that requires windstorm certification. a) Windstorm Information and Requirements. (1) 150 mph 3 second gusts, must uphold to new windstorm Code. (2) Contractor to submit Texas Department of Insurance (TDI) Application for Certificate of Compliance. (3) WPI-1; For New Construction or substantial alterations or additions to existing structures. (4) WPI-2; For alternations to existing building. (5) Email address: winstorm@tdi.texas.gov, (6) Website: https://www.tdi.texas.gov/wind/adopted-codes.html, (7) Risk Category I, (8) Minimum ultimate wind speed: 137 mph, (9) Exposure Category D. 3. Inbound Ticket Counter Conveyor (Room 1044 West Side) a. Construct inbound Ticket Counter Conveyor equipment on the West Side SA CT- 80 Scanner (Room 1044). Connection to existing conveyor system and other improvements as noted in the associated drawings.