Traffic Signal

Open State & local contract opportunity Posted

Solicitation number
T4746
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Florida Department of Transportation is soliciting bids for traffic signal and roadway improvements at three intersections along State Road 5 (US-1/NW Federal Highway) in Martin County, with letting scheduled for December 2, 2026. The source identifies no set-aside, preference, or local-vendor requirement. The project is federally aided under three projects (44441515201, 44441615201, and 44441715201) with Federal Aid numbers D426021B, D426022B, and D426023B.

The work covers the intersections with NW Baker Road, NW North River Shores Boulevard, and NW Sunset Boulevard across a total length of 0.227 miles in the City of Stuart and unincorporated Martin County. Scope includes maintenance of traffic, structure monitoring, environmental protection, earthwork, concrete, asphalt milling and resurfacing, pavement markings, signing, lighting, fiber optic installation, signalization, conduit work, and electrical service. Quantities include 34 vehicular traffic signals, 3 steel mast arm assemblies, 3 traffic controllers, 760 traffic control officer hours, 11,944 channelizing devices, 1,184 portable changeable message signs, 1,945 linear feet of thermoplastic markings, and 707 square feet of bike lane markings. The signal scope includes a signal preemption system, field ethernet, and UPS units.

The total proposal budget estimate is $3,205,618.00. The contract term is 315 contract days, preceded by a 10-day contract execution period, with a 120-day flexible start time.

Opportunity text

The Improvements under this Contract consist of, but are not limited to, MOT (standard, traffic control officer, barrier, ped LCD, arrow board, signalization, traffic detection, PCMS, business sign), monitor structures (inspection, settlement, vibration), environmental protection (sediment barrier, inlet, tree), earthwork (excavation, embankment, borrow), concrete (removal, curb, gutter, separator, sidewalk, driveway), asphalt (stabilization, base, milling, resurfacing), pavement markings (detectable, RPM, painted, thermo, bike lane), signing (single-column, internally-illuminated), lighting (conductors, load center, luminaire, pole complete, cable distribution), IST (subsurface doc, location doc, CCTV camera), fiber optic (cable, termination, hardware, locate), signalization (cable, cable remove, span wire remove, prestressed pole F & I/remove, aluminum pole pedestal/remove, steel mast arm, vehicular signal/detection, vehicular video/AVI, ped signal/detection, signal preemption system, controller, field ethernet, UPS), conduit (open trench, directional bore), pull/splice box, electrical service (power, wire), and sod at the intersection(s) of State Road 5 (US-1/NW Federal Highway) and NW Baker Road, and NW North River Shores Boulevard, and NW Sunset Boulevard, for a total of 0.227 miles in the City of Stuart, and in unincorporated portions of, Martin County.

Files

File Type Posted
T4746BSN.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors