Timber Ridge EST Rehabilitation

Closed State & local contract opportunity Posted

Solicitation number
2605-060
State
Texas
Responses due

Opportunity facts

Jurisdictions

Opportunity details come from friscotexas.bonfirehub.com. Updated .

About this opportunity

The Timber Ridge Elevated Storage Tank Rehabilitation project is a service procurement issued by Garland City in Collin County, Texas, with a deadline for proposal submission on June 25, 2026. The scope of work encompasses comprehensive rehabilitation of a 2.5-million-gallon elevated storage tank located at 6050 Timber Ridge Drive, Frisco, Texas, and includes five primary components: surface preparation and recoating of interior and exterior surfaces, structural repairs and modifications as detailed in the contract plans, installation of approximately 320 linear feet of storm drain piping, incorporation of an active mixing system with provisions for future chloramine boosting capability, and electrical and miscellaneous site improvements. Bidders are expected to review two extensive technical documents—the Timber Ridge EST Rehabilitation Specifications (73MB) and the Timber Ridge EST Rehabilitation Contract Drawings (30MB)—both posted on May 15, 2026, to understand the full technical requirements and deliverables. The project requires contractors with demonstrated qualifications in elevated storage tank rehabilitation, structural engineering, water system infrastructure, and electrical installation to ensure successful completion of all work elements.

The procurement documentation provided does not explicitly specify set-aside designations, disadvantaged enterprise restrictions, incumbent vendor information, or a defined budget range or award value. Contractors should review the complete specifications and drawings documents to identify any local, minority, or small business enterprise participation requirements that may be embedded within the contract terms. The technical scope indicates integration with existing water system infrastructure, particularly the active mixing system and potential future chloramine boosting provisions, suggesting that successful bidders must have experience coordinating with operational water utility systems to minimize service disruptions during rehabilitation activities. Interested parties should obtain the complete procurement documents and any subsequent addenda or clarifications prior to the June 25, 2026 deadline to ensure accurate and competitive proposal submissions.

Opportunity text

Surface preparation and recoating of the interior and exterior of the 2.5-million-gallon Elevated Storage Tank. (2) Structural repairs and modifications as detailed in the plans. (3) Approximately 320 linear feet of storm drain piping. (4) Incorporating an active mixing system with provisions for future chloramine boosting. (5) Electrical and miscellaneous site improvements. The Timber Ridge Elevated Storage Tank is located at 6050 Timber Ridge Drive, Frisco, TX 750

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity