1.0 MG Glenville Elevated Storage Tank Rehabilitation Project

Open State & local contract opportunity Posted

Solicitation number
901-27
State
Texas
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from cor.bonfirehub.com. Updated .

About this opportunity

The City of Glenville, Texas is soliciting bids under CSP No. 901-27 for rehabilitation of the existing 1.0 MG Glenville Elevated Water Storage Tank, with bids due December 15, 2026. The construction plans identify the City of Richardson, Texas as the issuer and place the tank at 1260 Columbia Drive, Richardson, Texas 75081, so the bidder should confirm the issuing entity before submitting. The project is estimated at $2.18 million.

Scope covers removal and replacement of interior and exterior protective coating systems, application of City logos, structural repairs to support legs and components, roof repairs, ladder replacements, valve modifications, and replacement of safety equipment and appurtenances. Site work includes containment for coating removal, traffic control, security fencing, and restoration with 1,500 square yards of Bermuda block sod. The estimate covers 39 base bid items and 2 alternate bid items. Inspection reports from Steel Inspectors of Texas, Inc. and Tank Industry Consultants, Inc. are appended to the plans. The contractor bears all costs for testing, chlorination, disinfection, flushing, utility coordination, and environmental compliance, and must obtain all permits, give 48-hour notice before utility shutdowns, contact Texas 811 at least 72 hours before construction, submit pre-mobilization site documentation for City approval, and conduct daily erosion control inspections. Funding derives from the City's municipal budget or water utility enterprise funds.

Opportunity text

The project consists of the rehabilitation of the existing 1.0 MG Glenville Elevated Water Storage Tank, including the removal and replacement of the interior and exterior protective coating systems, application of City logos, and other miscellaneous rehabilitation work as detailed in the contract documents and construction plans. For bidding purposes, it is estimated that the City will spend approximately, $2,1800,000 for this project.