About this opportunity
The Citadel is requesting bids for design-bid-build construction services to upgrade the main electrical system and elevator infrastructure at Dunnemann Apartments workforce housing in Charleston, South Carolina, with bids due July 14, 2026 at 2:00 p.m. A non-mandatory pre-bid conference is scheduled for June 23, 2026 at 10:00 a.m. at The Citadel Facilities and Engineering Conference Room, 520 Wilson Avenue, Charleston.
The scope includes replacement of the 1951-vintage main electrical distribution, switchboards, panels, meters, and wiring to add system capacity; demolition of two existing elevators; and installation of a single modern passenger elevator. Bidders must obtain official bidding documents from CEMS Engineering Inc. through Duncan Parnell to be considered official plan holders. Documents are available as electronic PDF files for $153 or printed hardcopy sets for $204 with no refundable deposit.
The construction cost range is $1.25 million to $1.75 million. Bid security is required at a minimum of 5% of the base bid. The successful contractor must provide Performance and Labor and Material Payment Bonds, each in the amount of 100% of the contract price. Hand delivery or mail submission to Michael Dunkerley at 520 Wilson Avenue, Charleston, SC 29409 is required; the agency will not accept email-submitted bids.
The Architect/Engineer is CEMS Engineering, Inc., represented by Jason Brawley at jbrawley@cems-ae.com or (843) 875-3637. The Agency Project Coordinator is Michael Dunkerley at mdunkerl@citadel.edu or (843) 566-4051.
Opportunity text
The scope includes main electrical system upgrades to add capacity to the 1951 infrastructure by replacing the main distribution, switchboards, panels, meters, and wiring. Work also includes the demolition of two existing elevators and the installation of a single, modern passenger elevator.
Files
| File | Type | Posted |
|---|---|---|
| Advertisement.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline