Telluride regional wastewater treatment plant (TRWWTP) dewatering press system
Closed State & local contract opportunity Posted
- Solicitation number
- 203093
- State
- Colorado
- Responses due
Opportunity facts
- Jurisdiction
- NIGP codes
- UNSPSC codes
- 73120000 Metal and mineral industries
- 73000000 Industrial Production and Manufacturing Services
- 31250000 Pneumatic and hydraulic and electric control systems
- 73110000 Wood and paper industries
- 70170000 Water resources development and oversight
- 30121722 PE rainwater and sewer separation walls
- 72140000 Heavy construction services
- 73160000 Machinery and transport equipment manufacture
- 73170000 Manufacture of electrical goods and precision instruments
Opportunity details come from bidnetdirect.com. Updated .
About this opportunity
The Town of Telluride, through Carollo Engineers, Inc., is seeking technical and cost proposals from dewatering press system manufacturers for a Dewatering Redundancy Project at the Telluride Regional Wastewater Treatment Plant. The procurement involves pre-selecting a single vendor to furnish a comprehensive dewatering press system, which includes one volute dewatering press with two dewatering drums, a mixing and flocculation tank, controls, and polymer equipment. Specific system components will encompass a polymer activation and blending chamber, dilution water assembly, solution discharge assembly, system skid, progressive cavity neat polymer metering pump, and electrical junction box. The project timeline indicates that proposals are due by November 14, 2024, with contract negotiations scheduled from November 14 to December 2, 2024, and a submittal drawings contract to be issued on December 4, 2024. Evaluation criteria will include proposal quality, cost, vendor experience, existing installations, references, warranty, delivery schedule, service capabilities, and compliance with RFP requirements. The construction contract is planned for bidding in February 2025, with a bid date in early March 2025 and a substantial completion date of September 30, 2025.
While no specific set-aside designations or enterprise restrictions were explicitly mentioned, the Town will directly contract with the pre-selected vendor, with the contract value capped at 10% of the total equipment cost. The project will be funded through the Town's capital improvements budget, with the expectation that the awarded construction contractor will manage procurement, installation, and commissioning of the dewatering press system. The procurement is specific to Washington County, Colorado, and targets manufacturers capable of providing a comprehensive, operational, and functional dewatering press system that meets the technical specifications outlined in the Request for Proposals. The selected vendor will be responsible for preparing and submitting complete shop drawings to the Engineer and Town in advance of the procurement contract. Though precise budget ranges were not specified, the comprehensive nature of the system and the project's infrastructure requirements suggest a significant investment in upgrading the regional wastewater treatment plant's dewatering capabilities.
Opportunity text
Carollo Engineers, Inc. (Engineer), on behalf of the Town of Telluride (Town) is requesting technical and cost proposals from dewatering press system manufacturers, also known as the Vendor, for pre-selection and submittal services for the upcoming Dewatering Redundancy Project. The Town will evaluate and preselect one manufacturer to furnish the redundant dewatering press system for installation at the existing plant. The system will include one volute dewatering press with two dewatering drums, one mixing and flocculation tank, controls, and polymer equipment. The new polymer blending and feed equipment will include a polymer activation and blending chamber, dilution water assembly, solution discharge assembly, system skid, progressive cavity neat polymer metering pump, and electrical junction box. The redundant dewatering press system will be provided by a single Vendor, each of these system components will include all materials to support an operational and functional installation that satisfies the requirements contained in this Request for Proposals (RFP) document and associated Technical Specifications. The Town will contract directly with the pre-selected Vendor to provide submittals and shop drawings for review and approval.
Files
| File | Type | Posted |
|---|---|---|
| TRWWTP_DewateringRedundancy_DewtrSysPreSelection_BID_Specs-Dwgs.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity