TCEC High Pressure Superheater & Reheater Sky Vent Valves RFP

Closed State & local contract opportunity Posted

Solicitation number
RFP# 2025-213
State
Florida
Responses due

Opportunity facts

Point of contact

Updated .

About this opportunity

Florida Municipal Power Agency (FMPA) issued a No Award Memo dated February 2, 2026, declining to award RFP 2025-213 for long-life replacement of high-pressure superheater and reheater sky vent valves at the Treasure Coast Energy Center. Proposals were due January 22, 2026 at 1:30 p.m. under Addendum 1, which moved the original January 15, 2026 at 10:00 a.m. deadline and changed no other terms. The RFP specifies no explicit set-asides.

The scope covers complete turnkey valve assemblies, including automatic actuator assemblies, valve bodies, trim, hardware, seals, 316 stainless steel components, instrumentation and control equipment, and corrosion-resistant materials for chloride-rich coastal environments. Deliverables include complete technical documentation, on-site field support, and commissioning. Work is performed at 4545 Energy Lane, Fort Pierce, Florida. Materials, drawings, and technical information must arrive at the Treasure Coast Energy Center by September 30, 2026, with installation and commissioning scheduled for December 3–10, 2026, during the fall outage. The vendor is responsible for off-site storage logistics, safety protocols, and quality assurance.

Pricing must be lump sum for materials, including freight and tariffs, plus labor, supervision, equipment, documentation, a minimum of 15 percent spare consumables, and three days of built-in schedule slippage. Required insurance includes comprehensive general liability of $2.0 million, automobile liability of $1.0 million, and workers' compensation at statutory limits. No performance bond or bid surety is required. The resulting agreement consists of a Master Agreement and project-specific Purchase Orders.

Evaluation criteria are technical compliance, vendor experience and references, schedule adherence, warranty offerings, safety and quality plans, and cost competitiveness. FMPA reserves the right to reject any or all proposals, negotiate if pricing exceeds available funds, award to multiple bidders, or move to the next-ranked proposer if performance issues arise. A mandatory site visit with walk-down was held December 2, 2025, at 10:00 a.m., with personal protective equipment required. A revised Questions and Answers file was posted January 21, 2026. The February 16, 2026 award estimate was superseded by the No Award Memo.

Opportunity text

Florida Municipal Power Agency (FMPA) invites proposals for a long-life replacement of the high-pressure superheater & reheater sky vent vales at the Treasure Coast Energy Center.

Files

File Type Posted
No_Award_Memo.pdf PDF
Questions_&_Answers_-_Revised.pdf PDF
Addendum_1.pdf PDF
TCEC_HP_Sky_Vent_Valves_RFP_FINAL.pdf PDF