Sylvester Power Improvements

Closed State & local contract opportunity Posted

Solicitation number
RFP-BRSP-190000001718-1
State
Michigan
Responses due

Opportunity facts

Jurisdiction
NIGP code
UNSPSC code

Updated .

About this opportunity

Berrien Springs Public Schools is seeking bids for the Sylvester Power Improvements project, a specialized electrical infrastructure upgrade located in Berrien County, Michigan. The procurement is structured as an Invitation to Bid, with proposals due on April 23, 2019, at 1:30 PM local time. The project involves providing a new power feed from the 480V Main Distribution Panel #2, installing conduit across the facility's roof to the north end, and connecting to a 480V to 208V transformer, which includes an exterior main switch disconnect for backfeed control. Bidders are required to submit a 5% bid bond with their proposals and must maintain bid validity for 30 days after opening. While no mandatory pre-bid meeting is scheduled, potential bidders are encouraged to arrange site visits with Ron Bartz, the Maintenance Coordinator, and technical questions should be directed to Doug Sayles, P.E. Bid documents are available for a refundable $50 fee (limited to three sets) or can be obtained electronically at no charge through CARMI Design Group.

The procurement appears to have no specific set-aside designations for disadvantaged enterprises, and the bid is open to qualified electrical contractors capable of completing the specified infrastructure improvements. Successful bidders must provide Performance Bond, Labor and Material Bonds, and appropriate insurance certificates. Additionally, bidders are required to disclose any familial relationships with school board members or the superintendent and must certify non-involvement with Iran-linked business activities as per the Iran Economic Sanctions Act. While no specific budget range is explicitly stated in the documentation, the project involves significant electrical infrastructure modifications that would likely require substantial technical expertise and capital investment. The bid documents suggest this is a focused infrastructure upgrade project with precise technical specifications, targeting improved power distribution and control capabilities within the Sylvester facility of Berrien Springs Public Schools.

Files

File Type Posted
Sylvester Power Improvements 2019.doc DOC document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity