Surface Recycle & Chip Seal - Kearny County
- The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is requesting bids on surface recycling and chip seal work on K-25 in Grant County spanning 9.854 miles, with bids due September 16, 2026 at 1:00 p.m. local time through the Bid Express website and opening at 3:00 p.m. the same day. Contractors must hold current KDOT prequalification and a current Tax Clearance Certificate from the Kansas Department of Revenue at the time of contract award. Contractors must...
- The Kansas Department of Transportation is requesting bids for chip seal construction across three segments in Meade and Gray counties totaling 31.767 miles, with proposals due electronically through Bid Express by 1:00 p.m. local time on September 16, 2026. Bidders must be prequalified contractors and must hold a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award; subcontractors must also obtain Tax Clearance Certificates prior to subcontract approval. The...
- The Kansas Department of Transportation is requesting sealed bids for surface recycle and chip seal treatment on 10.802 miles of roadway spanning Haskell and Seward Counties, with bids due September 16, 2026. The project comprises two segments: KA 4614-01 from the Haskell/Seward County line east to the US-83 Junction in Seward County, and KA-4615 from the US-56 Junction south to the Haskell/Seward County line in Haskell County. The scope includes surface recycling and chip seal application on...
- The Kansas Department of Transportation is requesting electronic bids for chip seal surfacing on approximately 23.876 miles of K-4 highway across Scott and Lane Counties, with proposals due September 16, 2026 at 1:00 p.m. and opening at 3:00 p.m. the same day. Bidders must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue at contract award. The project divides into two sections: KA 8011-01 from US-83 Junction east to the Scott/Lane...
- The Kansas Department of Transportation (KDOT) is seeking bids for scrub seal and chip seal treatment on US-24 in Riley County, spanning 4.20 miles from the West US-24/US-77 Junction to the East US-24/US-77 Junction, with electronic proposals due September 16, 2026 at 1:00 p.m. Local Time through Bid Express. Prequalified contractors only may bid. The scope includes scrub seal application, chip seal treatment with cover material (335 cubic yards of CM-L-0 and 467 cubic yards of CM-L-1),...
- The Kansas Department of Transportation is requesting bids on chip seal surfacing for US Route 36 in Washington County, spanning 9.176 miles from the eastern city limits of Washington to the Little Blue River Bridge, with proposals due September 16, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. Bidders must notify KDOT of intent to bid as a prime contractor by 5:00 p.m. on the Monday...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for milling and hot mix asphalt overlay work on US-36 in Cheyenne County from the Colorado/Kansas state line to Road 11, spanning 10.150 miles, with proposals due September 16, 2026 at 1:00 p.m. Local Time via Bid Express and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and must identify themselves as bid holders on KDOT's...
- The Kansas Department of Transportation is requesting bids on milling and hot mix asphalt overlay work on US-36 in Decatur County spanning 10.974 miles from the Rawlins/Decatur County line east to the US-36/US-83 junction under contract KA 8054-01, with proposals due September 16, 2026 at 1:00 PM local time. Bidding is restricted to prequalified contractors. Contractors must notify KDOT of intent to bid by 5:00 PM on the Monday preceding the letting date and submit electronic proposals through...
- The Kansas Department of Transportation (KDOT) is requesting sealed bids for a milling and hot mix asphalt overlay on K-27 in Hamilton County, spanning 15.917 miles from the Stanton/Hamilton county line north to the south city limit of Syracuse, with bids due September 16, 2026 at 1:00 p.m. local time and proposal reading at 3:00 p.m. at the Eisenhower State Office Building in Topeka. This is a federal-aid project (Federal Project Number ACSTP-A805(601), State Project Number K027-038 KA 8056-01,...
- The Kansas Department of Transportation (KDOT) is requesting bids for milling and hot mix asphalt overlay construction on K-23 in Sheridan County, with proposals due September 16, 2026 at 1:00 P.M. Local Time through the Bid Express platform and bid opening at 3:00 P.M. Local Time the same day at the Eisenhower State Office Building in Topeka. The scope covers milling and HMA overlay work on K-23 from Walnut Street in Hoxie north to 470 feet north of the K-23/U-24 junction, spanning 0.590 miles....
The Kansas Department of Transportation is requesting bids for surface recycle and chip seal work on K-25 in Kearny County, spanning 16.141 miles from the Grant/Kearny County line north to the south county line of Lakin, with bids due September 16, 2026 at 1:00 PM through Bid Express and opening at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. This is a federal-aid highway construction project (Federal Project Number ACSTP-A804(901), State Project Number K025-047 KA 8049-01) subject to Davis-Bacon wage requirements and all applicable federal labor standards. The scope includes surface recycling (2 inches), asphalt rejuvenating agent application, temporary pavement marking, emulsified asphalt seal coat, cover material placement, chip seal manipulation, and flexible raised pavement markers. Unit price items cover mobilization, traffic control, flagger services, water, and material for HMA patching, with contractors submitting their own pricing through the EBSX file system. Contractors must be prequalified and maintain a current Kansas Department of Revenue Tax Clearance Certificate. A bid bond is required with proposal submission. The contractor must execute the contract within ten business days of notice of award. The project allows 45 restricted working days to open the project to unrestricted traffic, with a total completion period of 55 working days. Earliest start date is May 1, 2027, and latest start date is June 28, 2027. Special provisions address noncollusion certifications, financial prequalification, fuel and asphalt price adjustments, environmental compliance including the Migratory Bird Treaty Act, stormwater pollution management, and prohibitions on foreign unmanned aerial systems under the American Security Drone Act of 2023.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-Surface Recycle _ Chip Seal - Kearny County.pdf | 1MB | 9/7/26 |