Sunset Strip (Richmond Street to Campbell Street) Roadway Improvements Project
Closed State & local contract opportunity Posted
- Solicitation number
- 3016-1226
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Milton Kanellakes purchasing@joliet.gov (815) 724-3925
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The City of Joliet, Illinois is soliciting bids under Request for Bid 3016-1226 for the Sunset Strip (Richmond Street to Campbell Street) Roadway Improvements Project in Will County, with bids due November 5, 2026 at 10:00 a.m. CST. Bidders must hold a Certificate of Prequalification from the Illinois Department of Transportation (IDOT), which is the controlling eligibility requirement.
The scope covers roadway excavation and paving, including removal of existing pavement, aggregate subbase, and Hot Mix Asphalt binder and surface courses. Concrete work includes Portland Cement Concrete curb and gutter, driveway aprons, and sidewalks. Drainage work includes storm sewer structures with frame and grate adjustments, and restoration includes topsoil placement and sodding.
Submissions require proposals, bid bonds, insurance documentation, and a completed bid table in Excel format. All other documents must be submitted in PDF. Bidders must create or log into a Euna Supplier Network account through the Bonfire Hub portal to access response templates, the legal advertisement, proposal forms and specifications, and project plans. The question deadline of October 28, 2026 at 4:00 p.m. CDT has passed.
Opportunity text
Roadway Excavation & Paving: Excavation of the existing roadway, installation of an aggregate subbase, Hot Mix Asphalt (HMA) binder course, and HMA surface course. Concrete Infrastructure: Installation of Portland Cement Concrete (PCC) curb and gutter, PCC driveway aprons, and PCC sidewalks. Drainage & Utilities: Storm sewer structures, along with structure frame and grate adjustments. Restoration: Topsoil placement and sodding.
Files
| File | Type | Posted |
|---|---|---|
| City of Joliet 3016-1226 sunset strip roadway improvements.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity