LOTT Clean Water Alliance is requesting bids for removal and replacement of 15kV fused switches and transformers at Substation A/B inside the headworks building at the Budd Inlet Treatment Plant in Olympia, Washington, with bids due August 26, 2026 and a mandatory pre-bid meeting and site visit on August 4 at 10:00 a.m. Pacific Time.
The scope involves removal of existing 15kV fused switches and dry-type transformers and installation of new, owner-furnished 15kV fused switches and oil-filled transformers. The project is subject to Washington state prevailing wage requirements, with a minimum of 15% of labor hours performed by apprentices. The contractor must hold current licensing, workers' compensation coverage, and a clean safety record; must not have experienced prior terminations for cause or default within five years; and must assign a project superintendent with prior experience supervising wastewater treatment plant improvement projects involving electrical system replacement.
The engineer's construction estimate ranges from $1.132 million to $1.446 million including sales tax. The contractor has 245 working days from the Notice to Proceed to achieve substantial completion, with a one-year correction period thereafter. Retainage is 5% of contract value (excluding sales tax), held for 45 days following final completion. Liquidated damages are assessed at $1,000 per working day for failure to achieve substantial completion within the specified timeframe. A bid guaranty bond or certified check equal to at least 5% of the total bid price is required at submission; the successful bidder must furnish performance and payment bonds each at 100% of the contract price. The contractor must maintain comprehensive insurance including $2 million commercial general liability, $1 million automobile liability, and workers' compensation as required by law. Electronic bid proposals must be submitted as PDF documents to the project portal by 2:00 p.m. Pacific Time on August 26; physical bid guaranty documents must be submitted in person at LOTT's office. The LOTT Clean Water Alliance Board of Directors is expected to award the contract on September 9, 2026.
Opportunity text
The project consists of removal of the existing 15kV fused switches and dry type transformers and replacement with new, Owner-furnished 15kV fused switches and oil-filled transformers at Substation A/B located inside the headworks building at the Budd Inlet Treatment Plan (BITP).
Files
| File | Type | Posted |
|---|---|---|
| AM1308 IFB Specifications.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity